U-Park Wyatt Street Temporary Event Space

Size: px
Start display at page:

Download "U-Park Wyatt Street Temporary Event Space"

Transcription

1 Adelaide City Council 26-May-2015 Doc No A15E01RP U-Park Wyatt Street Temporary Event Space Music Noise Assessment

2 U-Park Wyatt Street Temporary Event Space Music Noise Assessment Client: Adelaide City Council ABN: Prepared by AECOM Australia Pty Ltd Level 28, 91 King William Street, Adelaide SA 5000, Australia T F ABN May-2015 Job No.: AECOM in Australia and New Zealand is certified to the latest version of ISO9001, ISO14001, AS/NZS4801 and OHSAS AECOM Australia Pty Ltd (AECOM). All rights reserved. AECOM has prepared this document for the sole use of the Client and for a specific purpose, each as expressly stated in the document. No other party should rely on this document without the prior written consent of AECOM. AECOM undertakes no duty, nor accepts any responsibility, to any third party who may rely upon or use this document. This document has been prepared based on the Client s description of its requirements and AECOM s experience, having regard to assumptions that AECOM can reasonably be expected to make in accordance with sound professional principles. AECOM may also have relied upon information provided by the Client and other third parties to prepare this document, some of which may not have been verified. Subject to the above conditions, this document may be transmitted, reproduced or disseminated only in its entirety.

3 Quality Information Document U-Park Wyatt Street Temporary Event Space Ref Date Prepared by Reviewed by 26-May-2015 Natalie Redmond Simon Moore Revision History Revision Revision Date Details Name/Position Authorised Signature 0 26-May Initial Issue Simon Moore Principal Engineer - Acousitcs

4 Table of Contents Glossary i 1.0 Introduction Music noise criteria Noise modelling Methodology Noise sources Results Noise Emissions Noise Mitigation Noise Contours Discussion 6 Appendix A Residential receiver locations Appendix B Tabulated Noise Levels Appendix C Noise contours A B C

5 i Glossary A-weighting C-weighting db(a) db(c) db(lin) L eq,t L max A-weighting of sound pressure levels is used to approximate the frequency response of the human ear. C-weighting of sound pressure levels is used to approximate the frequency response of the human ear at very high sound levels. Unit for A-weighted sound pressure levels. Unit for C-weighted sound pressure levels. Unit for linear (un-weighted) sound pressure levels. Energy averaged noise level over the measurement period T'. This measure is commonly used when comparing the criterion noise level under environmental noise regulations and for comparison with relevant standards for air conditioning noise. The maximum noise level in a measurement period.

6 1 1.0 Introduction This report presents the results of a music noise assessment undertaken for U-Park Wyatt Street, which is proposed to be used as a temporary event space. It is proposed to hold musical events on the top floor of the car park, with the stage set up in the north-western corner facing south. This site is in close proximity to noise sensitive receivers at the following locations: - Mantra Hindmarsh Square, Hindmarsh Square Hindmarsh Square - Ibis Adelaide, 122 Grenfell Street Pirie Street The aim of the noise modelling is to predict music noise levels at sensitive receivers around the site based on the proposed event layout. Noise levels for all nearby sensitive receivers have been assessed and recommendations for possible noise mitigation strategies that will allow a higher noise level at the event venue without adversely affecting sensitive receivers have been suggested.

7 2 2.0 Music noise criteria In response to community concerns, the Adelaide City Council (ACC) have developed the Event Noise Mitigation Standard Operating Procedures (ENMSOP) which outlines the noise mitigation and procedural requirements for events held within the ACC public realm. The ENMSOP identifies several event types and their associated criteria. The proposed events for the U-Park Wyatt Street would likely be categorised as Events and Festivals with a Music Component. The proposed noise criteria for this event type are summarised in Table 1. Table 1 ACC music noise criteria at the FOH for Events and Festivals with a Music Component Day Time FOH Noise Criteria 1 (L eq,15min) Sunday to Thursday 7:00 am to 10:00pm 85 db(a) 10:01 pm to 6:59 am (the following day) 83 db(a) Friday and Saturday 7:00am to 12:00 am 90 db(a) Note 1: 12:01 am to 6:59 am 85 db(a) (the following day) In the absence of a suitable Front of House ( FOH ) location, the noise criteria are to be applied at a location that is 15 metres from the front of the stage area. For this assessment we have assumed that such an event would be held on a Friday or Saturday night until 12:00 am and outside of business hours. Should the event be held out of these times more stringent criteria from Table 1 would be applicable, and additional noise sensitive receiver locations would need to be assessed (i.e. office spaces and the like). Noise level targets for sensitive receivers have not been specified for Events and Festivals with a Music Component. The following noise goals for noise sensitive receivers are consistent with the superseded Noise Mitigation Standard Operating Procedures and have been adopted as objective criteria for the purpose of this modelling exercise: - 65 db(a) L eq,15min and 80 db(a) L max between 7:00 am and 12:00 am db(a) L eq,15min and 65 db(a) L max between 12:01 am and 6:59 am db(lin) L eq 15min in either of the 31.5, 63 or 125 Hz octave bands. Note that the higher receiver noise level targets for the Adelaide East End were adopted as the background noise environment would be similar to the proposed Wyatt Street location.

8 3 3.0 Noise modelling 3.1 Methodology Noise modelling was undertaken using SoundPLAN Version noise modelling software. The noise model for the U-Park Wyatt Street has been based on the proposal and typical stage layouts of similar events with a music component. The noise model utilised a 3D model of buildings within the ACC boundary supplied by the ACC in May 2014 and topographical information for the surrounding area. The model also included the proposed stage location, existing ventilation openings in the car park building, nearest sensitive receiver locations and ground absorption. 3.2 Noise sources The sound source levels were modelled based on achieving the FOH noise criteria for Events and Festivals with a Music Component, which is 90 db(a) L eq at 15 metres as described in Table 1. The octave band source spectrum levels modelled are presented in Table 2. Table 2 Modelled octave band source levels at FOH mixing desk Location L eq level at octave band centre frequency in Hz, db(a) Overall L eq FOH Noise Levels k 2k 4k 8k db(a) SoundPLAN 7.3 is a suite of environmental noise propagation programs.

9 4 4.0 Results 4.1 Noise Emissions Appendix A shows the location of sensitive receivers in relation to the Wyatt Street U-Park. Additionally, a summary of the sensitive receiver locations for each building is listed below: - Mantra Hindmarsh Square, eight floors of residential Hindmarsh Square, nine floors of residential - IBIS Hotel, sixteen floors of residential Pirie Street, nine floors of residential Table 3 summarises the highest predicted noise level for each building. Tabulated results for all modelled receiver locations are included in Appendix B. Table 3 Predicted noise levels summary, highest receiver at each building Receiver location Hindmarsh Square Overall music noise level, db(a) Noise level at octave band centre frequency, db(lin) L eq 31.5 Hz 63 Hz 125 Hz 37 m elevation (south façade) Pirie Street 40 m elevation (north façade) IBIS Hotel 44 m elevation (south façade) Mantra Hindmarsh Square 22 m elevation (west façade) Noise Mitigation Historically event organisers have desired FOH noise levels of greater than 90 db(a). In order to cater for this, we have modelled a scenario with conceptual noise mitigation in place. This will aid in determining if the installation of noise mitigation will allow for levels to be increased without exceeding criteria at noise sensitive receiver locations. The recommended noise mitigation is to temporarily board up the ventilation openings on the top floor of the eastern façade and the first 20 metres of the western façade (from the northern end). Materials such as plywood, plasterboard or sheet metal with a minimum surface density of 5 kg/m 2 can be used. Table 4 summarises the highest predicted noise level for each building. Tabulated results for all modelled receiver locations are included in Appendix B.

10 5 Table 4 Predicted noise levels with mitigation summary, highest receiver at each building Receiver location Hindmarsh Square Overall music noise level, db(a) Noise level at octave band centre frequency, db(lin) L eq 31.5 Hz 63 Hz 125 Hz 37 m elevation (south façade) Pirie Street 40 m elevation (north façade) IBIS Hotel 53 m elevation (south façade) Mantra Hindmarsh Square 28 m elevation (west façade) Noise Contours Predicted noise contours for U-Park Wyatt Street have been included in Appendix C. Noise contours have been produced for the overall predicted noise levels at both 25 and 45 metres above ground level, for the scenarios with and without noise mitigation.

11 6 5.0 Discussion The noise modelling results in Section 4.1 suggest that compliance with the music noise criteria is achievable without noise mitigation assuming the spectrum shape in Table 2. However, from previous event noise monitoring experience, the FOH noise level criteria of 90 db(a) may not be suitable for a night club style of event, as higher noise levels may be desirable. With noise mitigation the modelling results in Section 4.2 suggest that FOH levels may be increased by 5 db(a) assuming the same spectrum shape. Therefore, the suggested allowable noise limit is 95 db(a) when measured at a distance of 15 metres from the stage and/or speakers. Note that the outcome of this is controlled by the low frequency noise limit. If low frequency noise levels are less than the modelled octave band levels, it may be allowable for FOH levels to increase beyond this 5 db(a) margin. However, this would need to be confirmed through monitoring at the event. Existing ambient sound levels at the proposed location within the CBD, and the temporary nature of the proposed event, may also be grounds for further increasing the proposed music noise limits, but this would be reviewed on a case-by-case basis.

12 Appendix A Residential receiver locations

13 A-1 Appendix A Residential receiver locations Mantra Hindmarsh Sq 147 Pirie St Hindmarsh Sq IBIS Hotel U-Park Wyatt St Receiver Locations Louvered openings

14 Appendix B Tabulated Noise Levels

15 B-1 Appendix B Tabulated Noise Levels Table 5 Predicted Noise Levels - No Mitigation Receiver location Hindmarsh Square Overall music noise level, db(a) Noise level at octave band centre frequency, db(lin) L eq 31.5 Hz 63 Hz 125 Hz 34 m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west m elevation south m elevation south m elevation south m elevation south m elevation south m elevation south m elevation south m elevation south m elevation south Pirie Street 12 m elevation north m elevation north m elevation north m elevation north m elevation north m elevation north m elevation north m elevation north m elevation north IBIS Hotel 10 m elevation - south m elevation south m elevation south m elevation south

16 B-2 Receiver location Overall music noise level, db(a) Noise level at octave band centre frequency, db(lin) L eq 31.5 Hz 63 Hz 125 Hz 23 m elevation south m elevation south m elevation south m elevation south m elevation south m elevation - south m elevation south m elevation south m elevation south m elevation south m elevation south m elevation south Mantra Hindmarsh Square 6 m elevation (west, north end) m elevation (west, north end) m elevation (west, north end) m elevation (west, north end) m elevation (west, north end) m elevation (west, north end) m elevation (west, north end) m elevation (west, north end) m elevation (west, south end) m elevation (west, south end) m elevation (west, south end) m elevation (west, south end) m elevation (west, south end) m elevation (west, south end) m elevation (west, south end) m elevation (west, south end)

17 B-3 Table 6 Predicted Noise Levels With Noise Mitigation Receiver location Hindmarsh Square Overall music noise level, db(a) Noise level at octave band centre frequency, db(lin) L eq 31.5 Hz 63 Hz 125 Hz 34 m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west m elevation west Pirie Street 12 m elevation north m elevation north m elevation north m elevation north m elevation north m elevation north m elevation north m elevation north m elevation north IBIS Hotel 10 m elevation - south m elevation south m elevation south m elevation south m elevation south

18 B-4 Receiver location Overall music noise level, db(a) Noise level at octave band centre frequency, db(lin) L eq 31.5 Hz 63 Hz 125 Hz 26 m elevation south m elevation south m elevation south m elevation south m elevation - south m elevation south m elevation south m elevation south m elevation south m elevation south m elevation south Mantra Hindmarsh Square 6 m elevation (west, north end) m elevation (west, north end) m elevation (west, north end) m elevation (west, north end) m elevation (west, north end) m elevation (west, north end) m elevation (west, north end) m elevation (west, north end) m elevation (west, south end) m elevation (west, south end) m elevation (west, south end) m elevation (west, south end) m elevation (west, south end) m elevation (west, south end) m elevation (west, south end) m elevation (west, south end)

19 Appendix C Noise contours

20 IBIS Hotel OpenStreetMap (and) contributors, CC-BY-SA AECOM does not warrant the accuracy or completeness of information displayed in this map and any person using it does so at their own risk. AECOM shall bear no responsibility or liability for any errors, faults, defects, or omissions in the information metres DATUM GDA 1994, PROJECTION MGA ZONE 54 1:1,500 (when printed at A3) LEGEND U-Park Wyatt Street Noise Sensitive Receivers Buildings Leq,15min 40 db(a) 42 db(a) 44 db(a) 46 db(a) Hindmarsh Square Mantra Hindmarsh Square 147 Pirie Street 48 db(a) 58 db(a) 50 db(a) 60 db(a) 52 db(a) 62 db(a) 54 db(a) 64 db(a) 56 db(a) 66 db(a) U-Park Wyatt Street Event Noise Modelling 90 db(a) Noise Source, 25m AGL No Noise Mitigation PROJECT ID CREATED BY LAST MODIFIED AC SGM - 26/05/2015 Map 1 A3 size

21 IBIS Hotel OpenStreetMap (and) contributors, CC-BY-SA AECOM does not warrant the accuracy or completeness of information displayed in this map and any person using it does so at their own risk. AECOM shall bear no responsibility or liability for any errors, faults, defects, or omissions in the information metres DATUM GDA 1994, PROJECTION MGA ZONE 54 1:1,500 (when printed at A3) LEGEND U-Park Wyatt Street Noise Sensitive Receivers Buildings Leq,15min 40 db(a) 42 db(a) 44 db(a) 46 db(a) Hindmarsh Square Mantra Hindmarsh Square 147 Pirie Street 48 db(a) 58 db(a) 50 db(a) 60 db(a) 52 db(a) 62 db(a) 54 db(a) 64 db(a) 56 db(a) 66 db(a) U-Park Wyatt Street Event Noise Modelling 90 db(a) Noise Source, 45m AGL No Noise Mitigation PROJECT ID CREATED BY LAST MODIFIED AC SGM - 26/05/2015 Map 2 A3 size

22 IBIS Hotel OpenStreetMap (and) contributors, CC-BY-SA AECOM does not warrant the accuracy or completeness of information displayed in this map and any person using it does so at their own risk. AECOM shall bear no responsibility or liability for any errors, faults, defects, or omissions in the information metres DATUM GDA 1994, PROJECTION MGA ZONE 54 1:1,500 (when printed at A3) LEGEND U-Park Wyatt Street Noise Sensitive Receivers Buildings Leq,15min 40 db(a) 42 db(a) 44 db(a) 46 db(a) Hindmarsh Square Mantra Hindmarsh Square 147 Pirie Street 48 db(a) 58 db(a) 50 db(a) 60 db(a) 52 db(a) 62 db(a) 54 db(a) 64 db(a) 56 db(a) 66 db(a) U-Park Wyatt Street Event Noise Modelling 90 db(a) Noise Source, 25m AGL With Noise Mitigation PROJECT ID CREATED BY LAST MODIFIED AC SGM - 26/05/2015 Map 3 A3 size

23 IBIS Hotel OpenStreetMap (and) contributors, CC-BY-SA AECOM does not warrant the accuracy or completeness of information displayed in this map and any person using it does so at their own risk. AECOM shall bear no responsibility or liability for any errors, faults, defects, or omissions in the information metres DATUM GDA 1994, PROJECTION MGA ZONE 54 1:1,500 (when printed at A3) LEGEND U-Park Wyatt Street Noise Sensitive Receivers Buildings Leq,15min 40 db(a) 42 db(a) 44 db(a) 46 db(a) Hindmarsh Square Mantra Hindmarsh Square 147 Pirie Street 48 db(a) 58 db(a) 50 db(a) 60 db(a) 52 db(a) 62 db(a) 54 db(a) 64 db(a) 56 db(a) 66 db(a) U-Park Wyatt Street Event Noise Modelling 90 db(a) Noise Source, 45m AGL With Noise Mitigation PROJECT ID CREATED BY LAST MODIFIED AC SGM - 26/05/2015 Map 4 A3 size

Karuah Hard Rock Quarry. Summary of Environmental Monitoring Data

Karuah Hard Rock Quarry. Summary of Environmental Monitoring Data Karuah Hard Rock Summary of Environmental Monitoring Data For the Period: September 2014 1. Introduction This report has been completed to meet the requirements of Section 66(6) of the Protection of the

More information

A-100- Rev7-28 June Head Office: Perth, Western Australia. Machine Condition Monitoring Structural Dynamics

A-100- Rev7-28 June Head Office: Perth, Western Australia. Machine Condition Monitoring Structural Dynamics PROPOSED OUTER HARBOUR DEVELOPMENT PILE DRIVING NOISE ASSESSMENT REPORT BHP BILLITON IRON ORE 075063--6A-100- Rev7-28 June 2010 www.svt.com.au Head Office: Perth, Western Australia Kuala Lumpur, Malaysia

More information

Rev2.0-7 October 2011

Rev2.0-7 October 2011 OUTER HARBOUR DEVELOPMENT RAIL NOISE ASSESSMENT : WESTERN SPUR BHP BILLITON IRON ORE 075063-72-100-Rev2.0-7 October 2011 www.svt.com.au Head Office: Perth, Western Australia Acoustics Corrosion Kuala Lumpur,

More information

Review of Environmental Factors

Review of Environmental Factors Port Authority of New South Wales 24-Jan-2018 Review of Environmental Factors Client: Port Authority of New South Wales ABN: 50 825 884 846 Prepared by AECOM Australia Pty Ltd Level 21, 420 George Street,

More information

Metropolitan Planning Authority 25-Jul Thompsons Road, Clyde Creek and Casey Fields South (Residential) PSPs 53, 54 & 57.1 Transport Modelling

Metropolitan Planning Authority 25-Jul Thompsons Road, Clyde Creek and Casey Fields South (Residential) PSPs 53, 54 & 57.1 Transport Modelling Metropolitan Planning Authority Thompsons Road, Clyde Creek and Casey Fields South (Residential) PSPs 53, 54 & 57.1 Transport Modelling Thompsons Road, Clyde Creek and Casey Fields South (Residential)

More information

CHRISTCHURCH INTERNATIONAL AIRPORT NOISE MANAGEMENT PLAN. 28 March 2014 V10

CHRISTCHURCH INTERNATIONAL AIRPORT NOISE MANAGEMENT PLAN. 28 March 2014 V10 CHRISTCHURCH INTERNATIONAL AIRPORT NOISE MANAGEMENT PLAN 28 March 2014 V10 419879.1ws34.tmp Page 1 TABLE OF CONTENTS 1.0 Introduction... 3 2.0 Aircraft Noise - Operations... 5 2.1 City Plan Requirements...

More information

27 January Stayover by Ausco 44 Formation Street Wacol QLD Dear Myke,

27 January Stayover by Ausco 44 Formation Street Wacol QLD Dear Myke, Our Ref: L01316/PAK/15-184 27 January 2016 Stayover by Ausco 44 Formation Street Wacol QLD 4076 Attention: Mr Myke Cavanagh Dear Myke, Re: Stayover on Zeller Chinchilla Workers Accommodation Facility Development

More information

APPENDIX E. Urban Design

APPENDIX E. Urban Design APPENDIX E Urban Design energy2u Alliance North Sydney Zone Substation Redevelopment September 2010 E August 2010 North Sydney Zone Substation Redevelopment Urban Design Impacts on 136-140 Walker Street

More information

APPENDIX 3: Acoustic Assessment (Hegley Acoustic Consultants)

APPENDIX 3: Acoustic Assessment (Hegley Acoustic Consultants) APPENDIX 3: Acoustic Assessment (Hegley Acoustic Consultants) Proposed Waikato District Plan Section 32 - Te Kowhai Airpark Zone Report 1/355 Manukau Road Epsom, Auckland 1023 PO Box 26283 Epsom, Auckland

More information

Northeast Stoney Trail In Calgary, Alberta

Northeast Stoney Trail In Calgary, Alberta aci Acoustical Consultants Inc. 5031 210 Street Edmonton, Alberta, Canada T6M 0A8 Phone: (780) 414-6373, Fax: (780) 414-6376 www.aciacoustical.com Environmental Noise Computer Modelling For Northeast Stoney

More information

In this document the following words shall have the following meanings: Airport Coordination Limited, the Coordinator of London City Airport

In this document the following words shall have the following meanings: Airport Coordination Limited, the Coordinator of London City Airport LOCAL RULE 1 ADMINISTRATION OF THE LONDON CITY MOVEMENT CAP 1. POLICY A planning condition applicable at London City Airport limits the number of aircraft movements permitted at London City Airport to

More information

Brighton City Airport Brighton City Airport, Shoreham by Sea, BN43 5FF

Brighton City Airport Brighton City Airport, Shoreham by Sea, BN43 5FF Site: «JobCustom Site Address» Test date: «JobCustom PCT Test Date» Field measurements of sound insulation ANC Registration No: 117 REPORT No: «JobCustom ANC No.» Acoustic Associates Sussex Ltd Client:

More information

THIRTEENTH AIR NAVIGATION CONFERENCE

THIRTEENTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/13-WP/22 14/6/18 WORKING PAPER THIRTEENTH AIR NAVIGATION CONFERENCE Agenda Item 1: Air navigation global strategy 1.4: Air navigation business cases Montréal,

More information

Indicative AS3959 Bushfire Attack Level Assessment Report

Indicative AS3959 Bushfire Attack Level Assessment Report Indicative AS3959 Bushfire Attack Level Assessment Report This report has been prepared using the Simplified Procedure (Method 1) as detailed in Section 2 of AS3959-2009 (incorporating Amendment Nos 1,

More information

Runway 35 South & West (Jet) Departure Flight Path Amendment

Runway 35 South & West (Jet) Departure Flight Path Amendment Environmental Assessment Runway 35 South & West (Jet) Departure Flight Path Amendment Canberra Airport Airservices Australia 1 of 8 Environment Assessment Runway 35 South & West (Jet) Departure & North

More information

REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures

REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures Introduction The purpose of this document is to present an overview of the findings of the review of the Noise Abatement Procedures (NAPs) in place

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 171 AERONAUTICAL TELECOMMUNICATION SERVICES Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First

More information

Rushmoor Local Plan 6 July 2017 Louise Piper Planning Policy & Conservation Manager Richard Ward Environment & Airport Monitoring Officer

Rushmoor Local Plan 6 July 2017 Louise Piper Planning Policy & Conservation Manager Richard Ward Environment & Airport Monitoring Officer Rushmoor Local Plan 6 July 2017 Louise Piper Planning Policy & Conservation Manager Richard Ward Environment & Airport Monitoring Officer Today s presentation What is the Development Plan for Rushmoor

More information

AUCKLAND INTERNATIONAL AIRPORT MASTERPLAN

AUCKLAND INTERNATIONAL AIRPORT MASTERPLAN MASTERPLAN REPORT NO. 13365 VERSION A MARCH 2014 PREPARED FOR RCP 6 FOX STREET, PARNELL AUCKLAND, NEW ZEALAND MASTERPLAN DOCUMENT CONTROL Version Status Date Prepared By Reviewed By A Final 4 April 2013

More information

BUILDING ENERGY EFFICIENCY CERTIFICATE

BUILDING ENERGY EFFICIENCY CERTIFICATE BUILDING ENERGY EFFICIENCY CERTIFICATE BUILDING DETAILS Building name Melbourne Central Tower Certificate no. Owner's name GPT FUNDS MANAGEMENT 2 PTY LIMITED Building address 360 Elizabeth Street, Melbourne,

More information

West Gate IAC Hearing. Review of vibration and regenerated noise from construction

West Gate IAC Hearing. Review of vibration and regenerated noise from construction West Gate IAC Hearing Review of vibration and regenerated noise from construction Heilig & Partners West Gate Tunnel August 17 1 Involvement I have reviewed the tunnel alignment and the two portals to

More information

E40. Temporary activities

E40. Temporary activities E40. Temporary activities E40.1. Background Temporary activities contribute to Auckland's vibrancy and to the social, cultural and economic well-being of communities. Temporary activities also enable filming

More information

Certification Memorandum. Large Aeroplane Evacuation Certification Specifications Cabin Crew Members Assumed to be On Board

Certification Memorandum. Large Aeroplane Evacuation Certification Specifications Cabin Crew Members Assumed to be On Board Certification Memorandum Large Aeroplane Evacuation Certification Specifications Cabin Crew Members Assumed to be On Board EASA CM No.: CM CS-008 Issue 01 issued 03 July 2017 Regulatory requirement(s):

More information

Recommendation to Include Specific Safety Requirements in Geophysical Survey Contracts & Proposed Survey Contract Annex

Recommendation to Include Specific Safety Requirements in Geophysical Survey Contracts & Proposed Survey Contract Annex INTERNATIONAL AIRBORNE GEOPHYSICS SAFETY ASSOCIATION Recommendation to Include Specific Safety Requirements in Geophysical Survey Contracts & Proposed Survey Contract Annex Notice to Users This document

More information

MODEL FLYING NEW ZEALAND EXPOSITION. CAR Part 102 Unmanned Aircraft Operators Certificate

MODEL FLYING NEW ZEALAND EXPOSITION. CAR Part 102 Unmanned Aircraft Operators Certificate MODEL FLYING NEW ZEALAND EXPOSITION CAR Part 102 Unmanned Aircraft Operators Certificate Version 2 November 2017 Contents 1.0 BACKGROUND 5 1.1 Purpose 5 1.2 Compliance 5 1.3 Amending this document 5 2.0

More information

Welcome to Public Information Workshop 1. San Francisco International Airport FAR Part 150 Study Update Noise Exposure Map Report

Welcome to Public Information Workshop 1. San Francisco International Airport FAR Part 150 Study Update Noise Exposure Map Report Welcome to Public Information Workshop 1 Chetcuti Room, City of Milbrae 450 Poplar Avenue Milbrae, California 94030 Wednesday, June 4, 2014 5:45 p.m. to 6:45 p.m. PDT The FAA typically uses the airport

More information

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96 Bankstown Airport Master Plan 2004/05 > 96 24.1 Why Is Aircraft Noise Modelled? Modelling of the noise impact of aircraft operations has been undertaken as part of this MP. Such modelling is undertaken

More information

Annual Report /2016 Port Hedland Ambient Air Quality Monitoring Program

Annual Report /2016 Port Hedland Ambient Air Quality Monitoring Program Annual Report - 2015/2016 Port Hedland Ambient Air Quality Monitoring Program FINAL Port Hedland Industries Council 31 October 2016 Prepared by Katestone Environmental Pty Ltd DOCUMENT CONTORL Deliverable

More information

Aerodrome Surveys. Airside Operational Instruction 17 CONTENT:- 1. INTRODUCTION 2. PROCEDURES 3. TREATMENT OF OBSTACLES APPENDIX 2

Aerodrome Surveys. Airside Operational Instruction 17 CONTENT:- 1. INTRODUCTION 2. PROCEDURES 3. TREATMENT OF OBSTACLES APPENDIX 2 Aerodrome Surveys Airside Operational Instruction 17 CONTENT:- 1. INTRODUCTION 2. PROCEDURES 3. TREATMENT OF OBSTACLES APPENDIX 1 APPENDIX 2 SURVEY ASSESSMENT FORM DECLARATION OF COMPLIANCE (SAMPLE FORM)

More information

Inca de Oro Copper-Gold Project and Carmen deposit sale process

Inca de Oro Copper-Gold Project and Carmen deposit sale process PANAUST LIMITED ABN 17 011 065 160 Level 1, 15 James Street, Fortitude Valley, Brisbane QLD 4006 Australia PO Box 2297, Fortitude Valley Business Centre QLD 4006 T: +61 7 3117 2000 F: +61 7 3846 4899 E:

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

Economic Impact Assessment of the Cruise Shipping Industry in Australia, Cruise Down Under. Final Report September, 2010

Economic Impact Assessment of the Cruise Shipping Industry in Australia, Cruise Down Under. Final Report September, 2010 Economic Impact Assessment of the Cruise Shipping Industry in Australia, 2009-10 Cruise Down Under Final Report September, 2010 Document Control Job ID: 15640 Job Name: Project Director: Project Manager:

More information

IAGSA Survey Contract Annex

IAGSA Survey Contract Annex Notice to Users This document will be expanded and revised from time to time without notice. Users may obtain the most current version from IAGSA s web site at: www.iagsa.ca The Safety Policy Manual referred

More information

July 2018 RV PRODUCTION. Overview of towable and motorised recreational vehicles manufactured in Australia. Data Provided by nemaustralasia

July 2018 RV PRODUCTION. Overview of towable and motorised recreational vehicles manufactured in Australia. Data Provided by nemaustralasia y RV PRODUCTION Overview of towable and motorised recreational vehicles manufactured in Australia. Data Provided by nemaustralasia This research is undertaken in partnership between the National Association

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

Short Term Monitoring Program South Dingley Village, VIC

Short Term Monitoring Program South Dingley Village, VIC Short Term Monitoring Program Version Control Page Summary Version 2: 11 May 2015 4 and 5 Update of dot point 8 (page 4) regarding contribution of community noise on captured events. Deletion of Table

More information

PORT CAMPBELL TO ADELAIDE PIPELINE

PORT CAMPBELL TO ADELAIDE PIPELINE SOUTH EAST AUSTRALIA GAS PTY LTD ABN 73 096 437 900 as agent for and on behalf of the SEA Gas Partnership (ABN 81 366 072 976), a partnership of: APT SPV2 Pty Ltd (ACN 095 483 453) APT SPV3 Pty Ltd (ACN

More information

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager 5(7) 08/414 Erection of kennels and cattery at Baltree Farm, Hatchbank, Kinross, KY13

More information

Perth Noise Abatement Procedures - Change to Preferred Runways

Perth Noise Abatement Procedures - Change to Preferred Runways Environmental Analysis Summary Preferred Runways Perth Perth Airport Perth Noise Abatement Procedures - Change to Preferred Runways Environmental Analysis Summary April 2016 1 of 10 Environment Analysis

More information

DIRECTIVE 2002/30/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

DIRECTIVE 2002/30/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL L 85/40 DIRECTIVE 2002/30/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 26 March 2002 on the establishment of rules and procedures with regard to the introduction of noise-related operating restrictions

More information

CAA consultation on its Environmental Programme

CAA consultation on its Environmental Programme CAA consultation on its Environmental Programme Response from the Aviation Environment Federation 15.4.14 The Aviation Environment Federation (AEF) is the principal UK NGO concerned exclusively with the

More information

Gatwick Airport Limited. Response to Airports Commission Consultation. Appendix. Ian H Flindell & Associates - Ground Noise Report

Gatwick Airport Limited. Response to Airports Commission Consultation. Appendix. Ian H Flindell & Associates - Ground Noise Report Gatwick Airport Limited Response to Airports Commission Consultation Appendix 10 Ian H Flindell & Associates - Ground Noise Report GATWICK AIRPORT Technical Report in response to Airports Commission Consultation

More information

Short Term Monitoring Program Parkdale, VIC

Short Term Monitoring Program Parkdale, VIC Short Term Monitoring Program Version Control Page Summary Version 2: 11 May 2015 4 and 5 All data regarding CNE decreased by one, due to identified highest CNE in V1 being confirmed as a community noise

More information

Perth Airport Aircraft Noise Validation Study Terms of Reference

Perth Airport Aircraft Noise Validation Study Terms of Reference Perth Airport Aircraft Noise Validation Study Terms of Reference Change Summary Version 1: 6 April 2016 Section/ Clause Summary New Document 06/04/2016 Table of Contents 1. Purpose...3 2. Background...

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 173 FLIGHT CHECKING ORGANISATION APPROVAL Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 ISBN 0-11790-410-4

More information

TORONTO PEARSON INTERNATIONAL AIRPORT NOISE MANAGEMENT

TORONTO PEARSON INTERNATIONAL AIRPORT NOISE MANAGEMENT TORONTO PEARSON INTERNATIONAL AIRPORT NOISE MANAGEMENT Noise and the GTAA The GTAA is sensitive to the issue of aircraft noise and how it affects our neighbours. Since assuming responsibility for Toronto

More information

DETERMINATION OF SOUND POWER LEVELS OF A TRANSFORMER AND A REACTOR

DETERMINATION OF SOUND POWER LEVELS OF A TRANSFORMER AND A REACTOR DETERMINATION OF SOUND POWER LEVELS OF A TRANSFORMER AND A REACTOR Prepared for: Grand Bend Wind Limited Partnership Northland Power Inc. 30 St. Clair Avenue West, Unit 1700 Toronto, Ontario M4V 3Al October

More information

SKYLINER. Prime Residential Development Site PRS or Private Sale Potential. OCEAN DRIVE, EDINBURGH EH6 6JH

SKYLINER. Prime Residential Development Site PRS or Private Sale Potential. OCEAN DRIVE, EDINBURGH EH6 6JH Prime Residential Development Site PRS or Private Sale Potential SKYLINER OCEAN DRIVE, EDINBURGH EH6 6JH www.skylineredinburgh.com GUTHRIE AERIAL PHOTOGRAPHY APPROX. AREA FOR ILLUSTRATIVE PURPOSES ONLY

More information

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT OCTOBER - DECEMBER 2013

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT OCTOBER - DECEMBER 2013 NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT OCTOBER - DECEMBER 213 Date Version Comments Page 2 Foreword Airservices Australia has established a Noise and Flight Path Monitoring System

More information

Noise Management of Aircraft Operations at Airports.

Noise Management of Aircraft Operations at Airports. GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 10 AVIATION ENVIRONMENT PROTECTION SERIES A

More information

1.0 OUTLINE OF NOISE ANALYSIS...3

1.0 OUTLINE OF NOISE ANALYSIS...3 Table of Contents 1.0 OUTLINE OF NOISE ANALYSIS...3 2.0 METHODOLOGY...3 2.1 BACKGROUND...3 2.2 COMPUTER MODELING...3 3.0 EXISTING NOISE ENVIRONMENT...4 3.1 EXISTING SANTA MONICA MUNICIPAL AIRPORT NOISE...4

More information

Short Term Monitoring Program NSW, Caringbah Report. February 2013

Short Term Monitoring Program NSW, Caringbah Report. February 2013 NSW, Caringbah Report February 2013 Version Control Version Number Date Detail 1.0 February 2013 Initial Release. 2.0 May 2013 Updated formatting for table 2. 3.0 January 2014 Figure 5 and L90 values updated

More information

Shute Harbour Marina Development Marina Demand Update, February 2008

Shute Harbour Marina Development Marina Demand Update, February 2008 Shute Harbour Marina Development Marina Demand Update, February 28 Shute Harbour Marina Development Marina Demand Update, February 28 Copyright or content of this document is the property of Pacific Southwest

More information

CHAPTER 5 AEROPLANE PERFORMANCE OPERATING LIMITATIONS

CHAPTER 5 AEROPLANE PERFORMANCE OPERATING LIMITATIONS CHAP 5-1 CHAPTER 5 PERFORMANCE OPERATING LIMITATIONS 5.1 GENERAL 5.1.1 Aeroplanes shall be operated in accordance with a comprehensive and detailed code of performance established by the Civil Aviation

More information

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group

More information

University of Wollongong Innovation Campus Masterplan

University of Wollongong Innovation Campus Masterplan University of Wollongong Innovation Campus University of Wollongong Innovation Campus Masterplan Traffic and Transport Assessment Traffic and Transport Assessment Prepared for University of Wollongong

More information

Asia Pacific Regional Aviation Safety Team

Asia Pacific Regional Aviation Safety Team International Civil Aviation Organization (ICAO) Regional Aviation Safety Group (Asia & Pacific Regions) Asia Pacific Regional Aviation Safety Team GUIDANCE FOR AIR OPERATORS IN ESTABLISHING A FLIGHT SAFETY

More information

CAR AIR CONTINUING AIRWORTHINESS (GENERAL AVIATION OPERATIONS)

CAR AIR CONTINUING AIRWORTHINESS (GENERAL AVIATION OPERATIONS) CONTINUING AIRWORTHINESS (GENERAL AVIATION OPERATIONS) FOREWORD CONTENTS REVISION RECORD LIST of EFFECTIVE PAGES This Page Intentionally Left Blank FOREWORD The Civil Aviation and Maritime Navigation Authority

More information

GUERNSEY ADVISORY CIRCULARS. (GACs) EXTENDED DIVERSION TIME OPERATIONS GAC 121/135-3

GUERNSEY ADVISORY CIRCULARS. (GACs) EXTENDED DIVERSION TIME OPERATIONS GAC 121/135-3 GUERNSEY ADVISORY CIRCULARS (GACs) GAC 121/135-3 EXTENDED DIVERSION TIME OPERATIONS Published by the Director of Civil Aviation, Guernsey First Issue August 2018 Guernsey Advisory Circulars (GACs) are

More information

John Betts School Crossing Review

John Betts School Crossing Review John Betts School Crossing Review Paddenswick Road London Borough of Hammersmith & Fulham August 2015 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from the

More information

ICAO Initiatives on Aircraft Noise

ICAO Initiatives on Aircraft Noise ICAO Initiatives on Aircraft Noise Bruno A. C. Silva ICAO Environmental Officer ICANA Conference Frankfurt, 24 November 2016 OUTLINE What is ICAO? ICAO Trends on aircraft noise The ICAO Balanced on aircraft

More information

Environmental Assessment. Runway 14 Smart Tracking Approach Gold Coast Airport

Environmental Assessment. Runway 14 Smart Tracking Approach Gold Coast Airport Environmental Assessment Runway 14 Smart Tracking Approach Gold Coast Airport Table of Contents Introduction ` 3 Runway 14 Smart Tracking approach 3 Assessment 3 Assumptions 3 Nominated aircraft 3 How

More information

Sustainable Procurement Policy for Heathrow Airport Limited

Sustainable Procurement Policy for Heathrow Airport Limited Sustainable Procurement Policy for Heathrow Airport Limited Date of policy: May 2017 Author: Dianne Armstrong / Chris Allen Approved by: Exec David Ferroussat Procurement Director Pete Hughes - Head of

More information

Cairns Airport Aircraft Noise Information Report

Cairns Airport Aircraft Noise Information Report Cairns Airport Aircraft Noise Information Report Quarter 4 2013 (October to December) 1 Version Control Version Number Detail Prepared by Date 1 - Environment February 2014 Airservices Australia. All rights

More information

Non-technical summary

Non-technical summary Introduction NTS1 NTS2 NTS3 Troika Developments Ltd (Troika) has submitted a planning application to Bournemouth Borough Council (BBC) for an extension of time to implement planning permission 7/2004/16450/G,

More information

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JULY - SEPTEMBER 2011

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JULY - SEPTEMBER 2011 NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JULY - SEPTEMBER 211 Date Version Comments Page 2 Foreword Airservices Australia has established a Noise and Flight Path Monitoring System

More information

Travelodge Hotels Limited. Outline Requirements. June /12 Highfield Road, Edgbaston, Birmingham B15 3EB. Tel: Fax:

Travelodge Hotels Limited. Outline Requirements. June /12 Highfield Road, Edgbaston, Birmingham B15 3EB. Tel: Fax: Travelodge Hotels Limited Outline Requirements June 2014 11/12 Highfield Road, Edgbaston, Birmingham B15 3EB Tel: 0121 454 4581 Fax: 0121 454 5206 Travelodge Hotels Limited Outline Requirements September

More information

L 342/20 Official Journal of the European Union

L 342/20 Official Journal of the European Union L 342/20 Official Journal of the European Union 24.12.2005 COMMISSION REGULATION (EC) No 2150/2005 of 23 December 2005 laying down common rules for the flexible use of airspace (Text with EEA relevance)

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

LAX Community Noise Roundtable. Aircraft Noise 101. November 12, 2014

LAX Community Noise Roundtable. Aircraft Noise 101. November 12, 2014 LAX Community Noise Roundtable Aircraft Noise 101 November 12, 2014 Overview Roles and Responsibilities for Aircraft Noise Relevant Federal Regulations Relevant California Regulations Aircraft Noise Metrics

More information

Perth Airport. Runway 21 Night-Time Departure Trial Proposal. Environmental Analysis Summary. August Airservices Australia 1 of 17

Perth Airport. Runway 21 Night-Time Departure Trial Proposal. Environmental Analysis Summary. August Airservices Australia 1 of 17 Perth Airport Runway 21 Night-Time Departure Trial Proposal Environmental Analysis Summary August 2015 Airservices Australia 1 of 17 Change Summary Version Date Change Description Amended by 1 6 August

More information

Subpart A General Purpose... 7

Subpart A General Purpose... 7 Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Subpart

More information

AIRSERVICES AUSTRALI A

AIRSERVICES AUSTRALI A AIRSERVICES AUSTRALI A NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JANUARY - MARCH 211 Page 2 Foreword Airservices Australia has established a Noise and Flight Path Monitoring System

More information

7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT

7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT 7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: HEAD OF ECONOMIC PROMOTION AND PLANNING Contact Officer: Nathan Spilsted, Senior Planning Officer Email: nathan.splistead@midsussex.gov.uk

More information

Cairns Airport Aircraft Noise Information Report

Cairns Airport Aircraft Noise Information Report Cairns Airport Aircraft Noise Information Report Quarter 4 2015 (October to December) 1 Version Control Version Number Detail Prepared by Date 1 - Environment February 2016 Airservices Australia. All rights

More information

Project No Brent Cross, Cricklewood London, UK Phase 1A North RMA

Project No Brent Cross, Cricklewood London, UK Phase 1A North RMA Project No. 431679 Brent Cross, Cricklewood London, UK Phase 1A North RMA River Overshadowing Impact Study For Waterman Energy, Environment & Design 18 th November 2014 431679 Report 2 Rel.3 1 of 23 431679rep2v3.docx

More information

Cairns Noise Information Pack. December 2011

Cairns Noise Information Pack. December 2011 Cairns Noise Information Pack December 2011 Table of Contents Purpose 2 Overview 2 Cairns Airport 3 Hours of Operation 3 Runway Configuration 3 Air Traffic 3 Track Density Plot for all aircraft operations

More information

Cairns Airport Aircraft Noise Information Report. Quarter (July to September)

Cairns Airport Aircraft Noise Information Report. Quarter (July to September) Cairns Airport Aircraft Noise Information Report Quarter 3 2012 (July to September) 1 Version Control Version Number Detail Prepared by Date 1 - Environment 19 December 2012 Airservices Australia. All

More information

Italian Forum Cultural Centre

Italian Forum Cultural Centre Italian Forum Cultural Centre Hire Agreement Schedule 4 Fee Rate Card Proudly Operated by ACA Sydney Pty Ltd The Italian Forum Performance Precinct Shop 30a, Italian Forum 23 Norton Street Leichhardt PO

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer   Tel: 7. TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: Contact Officer: Wards Affected: Key Decision: Report to: HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Email: nathan.spilsted@midsussex.gov.uk

More information

National Packaging Covenant Annual Report 2007/2008 PUBLIC DOCUMENT

National Packaging Covenant Annual Report 2007/2008 PUBLIC DOCUMENT National Packaging Covenant Annual Report 2007/2008 PUBLIC DOCUMENT October 2008 CONTENTS EXECUTIVE SUMMARY... 3 1. COMPANY PROFILE AND CONTACT... 4 Myer Pty Ltd Profile... 4 Contact Person... 4 2. PRODUCT

More information

(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY

(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY (DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY 26 May 04 TABLE OF CONTENTS CONTENTS... PAGE SECTION 1: INTRODUCTION...3 SECTION 2: RVSM OPERATIONAL CONCEPT...3 SECTION 3: AFI

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 13 OCCURRENCE REPORTING Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First Issue published for

More information

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy 1. Introduction (Deadline for consultation responses is 19 February 2016) The CAA is currently

More information

at: Accessed May 4, 2011.

at:   Accessed May 4, 2011. 3.11 SAFETY 3.11.1 Background and Methodology As with other forms of transportation, there is risk associated with aviation activities. This section focuses on risk to those on the ground near airports.

More information

Communication and consultation protocol

Communication and consultation protocol Communication and consultation protocol Airservices Australia 2011 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without

More information

AIRSERVICES AUSTRALI A

AIRSERVICES AUSTRALI A AIRSERVICES AUSTRALI A NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT APRIL - JUNE 211 Date Version Comments Page 2 Foreword Airservices Australia has established a Noise and Flight

More information

Relationship of bylaw with the Ngati Tuwharetoa, Raukawa and Te Arawa River Iwi Waikato River Act

Relationship of bylaw with the Ngati Tuwharetoa, Raukawa and Te Arawa River Iwi Waikato River Act Contents 1. Title......... 3 2. Commencement...... 3 3. Purpose......... 3 4. Interpretation...... 3 5. Camping Grounds...... 4 6. Freedom Camping...... 4 7. Offences and penalties...... 5 8. Relationship

More information

CAR AIR CONTINUING AIRWORTHINESS (GENERAL AVIATION OPERATIONS)

CAR AIR CONTINUING AIRWORTHINESS (GENERAL AVIATION OPERATIONS) CONTINUING AIRWORTHINESS (GENERAL AVIATION OPERATIONS) FOREWORD CONTENTS REVISION RECORD LIST of EFFECTIVE PAGES This Page Intentionally Left Blank FOREWORD The Civil Aviation and Maritime Navigation Authority

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

MODEL AERONAUTICAL ASSOCIATION OF AUSTRALIA

MODEL AERONAUTICAL ASSOCIATION OF AUSTRALIA MODEL AERONAUTICAL DISPLAY PROCEDURE MOP019 APPROVED: MAAA PRESIDENT Date: 18/09/2013 Table of Contents 1. INTRODUCTION... 1 2. PURPOSE... 1 3. SCOPE... 1 4. REFERENCES... 1 5. DEFINITIONS... 2 6. POLICY...

More information

Level Crossings Configuration Standards

Level Crossings Configuration Standards Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Configuration Standards ETD-16-04 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 01 Document

More information

EPILEPSY SOCIETY OF AUSTRALIA

EPILEPSY SOCIETY OF AUSTRALIA EPILEPSY SOCIETY OF AUSTRALIA SPONSORSHIP & EXHIBITION PROSPECTUS INVITATION TO THE SPONSOR On behalf of the Epilepsy Society of Australia, I have great pleasure in inviting you to sponsor or exhibit at

More information

Doncaster Local Plan. Housing and Economic Land Availability Assessment (HELAA) July 2017 Update Employment Sites

Doncaster Local Plan.  Housing and Economic Land Availability Assessment (HELAA) July 2017 Update Employment Sites Doncaster Local Plan Housing and Economic Land Availability Assessment (HELAA) July 2017 Update Employment Sites www.doncaster.gov.uk 1. Introduction & Background 1.1 Doncaster Council published its Housing

More information

An advisory circular may also include technical information that is relevant to the rule standards or requirements.

An advisory circular may also include technical information that is relevant to the rule standards or requirements. Advisory Circular AC61-19 Pilot Licences and Ratings Flight Examiner Ratings Revision 13 02 July 2018 General Civil Aviation Authority advisory circulars contain guidance and information about standards,

More information

East Midlands Airport 2018 Aerodrome Manual

East Midlands Airport 2018 Aerodrome Manual East Midlands Airport 2018 Aerodrome Manual Version 1.0 Not Valid after 31 st December 2018 Department Operations Document Owner Operations Director (Accountable Manager) Document Administrator Ops Development

More information

Dublin Airport - Noise Management Plan

Dublin Airport - Noise Management Plan Dublin Airport - Noise Management Plan May 2018 Issue: Final Prepared By: daa Reviewed By: Noise Strategy Working Group 15/5/2017 Authorised By: Group Head Asset Care 22/05/2018 Contents Abbreviations...

More information

Part 149. Aviation Recreation Organisations - Certification. CAA Consolidation. 1 February 2016

Part 149. Aviation Recreation Organisations - Certification. CAA Consolidation. 1 February 2016 Part 149 CAA Consolidation 1 February 2016 Aviation Recreation Organisations - Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 149 prescribes rules governing the

More information

Gatwick Airport s Assessment of Heathrow North-West Runway: Air Noise. July The world s leading sustainability consultancy

Gatwick Airport s Assessment of Heathrow North-West Runway: Air Noise. July The world s leading sustainability consultancy Gatwick Airport s Assessment of Heathrow North-West Runway: Air Noise July 2014 The world s leading sustainability consultancy AIR NOISE FINAL REPORT Gatwick Airport Assessment of Heathrow North-West Runway:

More information