1 Memo Date: Friday, December 22, 2017 Project: To: From: Subject: Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP Development of the Existing and Proposed Network HDR was retained by the City of to establish a trail plan for the City and perform a feasibility analysis for the top four priority trails proposed. This memo outlines how the existing trail network was established, how proposed trail alignments were developed, and how each of the proposed alignments was analyzed to develop a priority list for further feasibility analysis. Identification of Preliminary Trail Network The preliminary trail network map was developed by compiling existing trail maps, known project maps, past studies, discussions with City staff, and field reviews of the City s facilities. The existing studied projects are summarized in Table 1. The past trail planning work was augmented by HDR to identify gaps in the network and possible trail connections that would help close the gaps and create a more robust network. The existing network is shown in Figure 1. Key to this network was the connection of significant destinations which are important activity centers including: schools, parks, transit options, and community centers and facilities. Another critical facility for the community is the Florida Hospital Fish Memorial which is a large medical facility, employer, and activity center for the community. The schools and parks identified for this study are listed below. PARKS & RECREATION COMPLEXES A. VALENTINE PARK B. OAK AV PARK B. SHUFFLEBOARD COMPLEX B. WAVA HALL C. DICKINSON PARK D. MARSHALL PARK E. VETERANS MEMORIAL PARK F. COLEMAN PARK G. WAGGIN' TRAIL DOG PARK H. PFC EMORY L BENNETT PARK I. POOSER PARK J. GATEWAY PARK K. MILL LAKE PARK SCHOOLS A. ORANGE CITY ELEMENTARY SCHOOL B. RIVER SPRINGS MIDDLE SCHOOL C. MANATEE COVE ELEMENTARY D. UNIVERSITY HIGH SCHOOL 1

2 Table 1 Summary of Existing Path and Sidewalk Studies STUDY FACILITY TYPE SIDE WIDTH LENGTH N/E S/W E Graves Ave Sidewalk S 6-8ft 6200ft Leavitt Ave Veteran s Memorial Pkwy N Leavitt Ave Sidewalk E 8ft 2600ft Graves Ave Lansdowne Ave E Lansdowne Ave Sidewalk S 8ft 1430ft Volusia Ave (US 17-92) S Holly Ave Sidewalk W 8ft 2000ft Blue Springs Ave Orange Ave Graves Ave FEATURES NEEDED Crosswalk, Curb Crosswalk, Curb Grass Strip, Curb, Handrail, Drainage, Driveway Apron Sidewalk, Concrete Driveway Apron, Curb Cut Ramps, Crosswalk E Ohio Ave Sidewalk N 5ft 950ft Thorpe Ave Leavitt Ave Continuous Sidewalk, ADA Compliant Concrete Apron N Orange Ave Sidewalk E 600ft French Ave University Ave New Sidewalk, Gravity Wall, Crosswalk E Graves Ave Sidewalk S 5-8ft 1400ft Thorpe Ave Leavitt Ave New Sidewalk, Crosswalk W Graves Ave Multiuse S 10ft -- Volusia Ave Park Street Trail head, New Trail Sidewalk, Crosswalk Park Ave W French Ave Multiuse Trail Shared- Use Path E 10ft -- French Ave Graves Ave Continuous Sidewalk, Crosswalk N 10ft 3205ft Valentine Park Spring to Spring Trail W French Ave Sidewalk N 5ft 6750ft Volusia Ave Valentine Park Pedestrian Bridge, Concrete Path, Boardwalk, Easement New Sidewalk, Crosswalk, Curb Ramp AUTHOR Lassiter Transportation Group, Inc. Lassiter Transportation Group, Inc. Infrastructure Engineers, Inc. Infrastructure Engineers, Inc. Reynolds, Smith and Hills, Inc. YEAR OF REVIEW June 2015 June 2015 Oct 2014 Oct 2014 Jan 2013 Kimley Horn Sept 2015 Kimley Horn Sept 2015 HNTB Sept 2005 HNTB Sept 2005 Sprinkle Consulting Feb 2013 Sprinkle Consulting Feb

3 SPARKMAN AV S MONASTERY RD Existing Shared-Use Path/Trail Programmed Shared-Use Path/Trail Programmed Sidewalk/Streetscape Project Trail Head Hospital Public Schools Spring to Spring Trail NEW YORK AV W 17 AB 472 MINNESOTA AV E LEAVITT AV N CRA Boundary Parks Limits Blue Springs State Park SPARKMAN AV N CARPENTER AV N PARK AVE WISCONSIN AV E THORPE AV N LANSDOWNE AV E FRENCH AV E UNIVERSITY AV CR 4101 BLUE SPRINGS AV W GRAVES AV W CARPENTER AV S RHODE ISLAND AV W (J) BIRCH AV DOGWOOD AV FERN DR W HOLLY DR W (E) 17 AB 15 HWY (VOLUSIA AV S) US Mill Lake Loop (K) (I) (F) THORPE AV S (G) RHODE ISLAND AV E IRIS DR E HILLSIDE AV HARLEY LEAVITT AV S CR 4156 (ENTERPRISE RD) CR 4145 (GRAVES AV E) SOUTHLAKE STRICKLAND BLVD (H) Florida Hospital Fish Memorial CR 4146 (SAXON BLVD) D R VETERANS MEMORIAL PKWY 4 KENTUCKY AV S I-4 W Deltona DeBary Path: E:\Data1\Orange_City_Trails\7.2_Work_in_Progress\Map_Docs\Draft\Fig_01_Exiting_and_Programmed_Trails_11x17.mxd - User: MSCHMEDT - Date: 12/1/2017 O Miles Trail Plan Existing and Programmed Trail Network Figure 1

4 On May 23 rd, 2017 HDR met with the City of and reviewed the existing materials as well as drove many of the viable corridors for trail expansion. The discussions with the City in the field meeting as well as subsequently by phone helped direct the plan to best meet the bicycle and pedestrian connection goals for the City. The culmination for the assimilation and analysis of bicycle and pedestrian mapping is shown in Figure 2, the City of Existing and Proposed Trail Network. It includes existing facilities, programmed improvements such as those along French Avenue and Holly Avenue, and proposed alignments developed by HDR to connect bicyclists and pedestrians to community destinations. For the purpose of this trail network, all facilities that would encourage bicycle and pedestrian activities were identified including any shared use path of eight feet or wider. It is understood that as the network matures and use grows, that wider paths may be needed to provide greater capacity and ease of use where narrower paths exist today. Trail Corridor Prioritization The City of Proposed Trail Network Map proposes more trails than the City can develop in the immediate future. HDR developed a prioritization screening evaluation criteria and analysis procedure custom to the request of the City to guide future investment. This screening uses GIS to evaluate each project based on its ability to meet the City s multi-modal mobility goals making bicycle and pedestrian travel safer and more viable to key destinations. The six primary considerations of the evaluation criteria were as follows: 1. Regional Trail Corridors; 2. Other Local Trails (existing or programmed); 3. Significant Destinations (Parks, Recreation Areas, Schools/Colleges, Community Centers); 4. Bike/Ped Crash Frequency (Years ); 5. Total Population, Employment and school enrollment within ½ mile of trail project, per trail mile of project segment; 6. and Removes Barriers (Provides crossing / connection over arterial). The evaluation criteria and ranking methodology is presented in Table 2. The prioritization category weights were finalized based on input from staff and City Council. To organize trail development for the City, HDR segmented the proposed trail network into manageable projects, each with distinct value to the community. By evaluating the Proposed Trail Network through segmentation and evaluation criteria, a list of ranked projects was developed for use by the City. The segments and rankings are listed in Table 3 and represented graphically on Figure 3. These projects are set for further analysis in upcoming phases of this study to determine the type and feasibility of the connections identified as most valuable to the community. The top four projects identified in the prioritization project include the following: 1. Graves Central. Graves Central is a project that would connect the existing segment of trail on Graves Avenue west of US with City Hall and beyond east of US This is a critical link between the two sides of the community, schools and recreational opportunities on Holly Avenue and at Mill Lake Park. 4

5 2. Blue Springs Avenue. The Blue Spring Avenue trail links Mill Lake Park with the existing trail head for the Spring to Spring Trail. 3. Rhode Island West. Rhode Island West is a key east-west segment that would provide linkage to several schools located west of US Threadgill. The fourth trail identified is a connection on the west side of the Florida Hospital Fish Memorial campus on Threadgill Place between Harley Strickland Boulevard and Saxon Boulevard. Following approval of the top four prioritized trails, the next step is to complete trail corridor feasibility reviews and concept summaries that will evaluate and determine feasible ways to add these new trail segments to the City s trail network. The concept plan for each corridor will describe and provide a map for the proposed trail alignment, and provide photos, notes, and discussion of issues, constraints, and opportunities, as well as a preliminary cost estimate. 5

6 SPARKMAN AV S MONASTERY RD Existing Shared-Use Path/Trail Programmed Shared-Use Path/Trail Programmed Sidewalk/Streetscape Project Spring to Spring Trail NEW YORK AV W 17 AB 472 MINNESOTA AV E LEAVITT AV N 12 Proposed Shared-Use Path/Trail Trail Head Proposed Shared-Use Path/Trail Endpoint Project ID Hospital Public Schools CRA Boundary Parks Limits Blue Springs State Park UV 18 BLUE SPRINGS AV W UV 15 UV 4 UV 11 SPARKMAN AV N CARPENTER AV N CARPENTER AV S PARK AVE GRAVES AV W RHODE ISLAND AV W BIRCH AV DOGWOOD AV FERN DR W HOLLY DR W (E) 17 AB 15 HWY (VOLUSIA AV S) US (I) WISCONSIN AV E THORPE AV N UV UV UV UV 16 (F) UV 8 UV UV 2 12a Mill Lake Loop (K) UV 12b THORPE AV S (G) IRIS DR E HILLSIDE AV LANSDOWNE AV E CR 4156 (ENTERPRISE RD) FRENCH AV E RHODE ISLAND AV E HARLEY LEAVITT AV S UV 1 UNIVERSITY AV CR 4145 (GRAVES AV E) SOUTHLAKE UV 10 UV 9 UV 17 STRICKLAND BLVD UV 13 D R VETERANS MEMORIAL PKWY UV 14 (H) UV 3 Florida Hospital Fish Memorial 4 CR 4101 KENTUCKY AV S I-4 W Deltona (J) CR 4146 (SAXON BLVD) DeBary Path: E:\Data1\Orange_City_Trails\7.2_Work_in_Progress\Map_Docs\Draft\Fig_02_Exiting_and_Proposed_Trails_11x17.mxd - User: MSCHMEDT - Date: 12/1/2017 O Miles Trail Plan Existing and Proposed Trail Network Figure 2

7 Table 2 Evaluation Criteria Category Criteria Points Weight Regional Trail Corridors Connects to TPO Identified Regional Trail System (e.g., Spring to Spring Trail) 100 5% Other Local Trails (existing or programmed) Significant Destinations (Parks, Recreation Area, Schools/Colleges, Community Centers) Bike/Ped Crash Frequency (Years ) Total Population, Employment and school enrollment within ½ mile of trail project, per trail mile of project segment Removes Barriers (Provides connection over arterial) Continuation of an existing or programmed trail 100 Direct connection to an existing or programmed trail 50 Direct connection to 2 or more significant destinations 100 Direct connection to 1 significant destination 80 Indirect connection within 0.25 mile to 2 or more significant destinations 60 Indirect connection within 0.25 mile to 1 significant destination 40 Indirect connection within 0.5 mile to 1 or more significant destinations 20 Total Bike/Ped crashes per mile of project length > Total Bike/Ped crashes per mile of project length Total Bike/Ped crashes per mile of project length Total Bike/Ped crashes per mile of project length Total pop + emp + school enrollment within 0.5 mile of project, per trail mile >= 10, Total pop + emp + school enrollment within 0.5 mile of project, per trail mile = 7,500-9, Total pop + emp + school enrollment within 0.5 mile of project, per trail mile = 5,000-7, Total pop + emp + school enrollment within 0.5 mile of project, per trail mile = 2,500-4, Total pop + emp + school enrollment within 0.5 mile of project, per trail mile < 2, Provides a connection across four or more lanes of an arterial for bicycling and/or walking 100 Provides a connection across three or fewer lanes of an arterial for bicycling and/or walking 50 20% 30% 10% 20% 15% 7

8 Table 3 Trail Segment Scoring ID NAME Length (mi) Regional Trail Connection Local Trail Connection Significant Destinations Crash Frequency Pop/ Emp/ School Barrier Removal 2 Graves Central Blue Springs Ave Rhode Island West Threadgill Thorpe Carpenter Veterans Parkway Leavitt Central Rhode Island East Sparkman Graves East Harley Strickland / Junior St / Thorpe 7 Leavitt North Leavitt South Lawton / Graves West Parkway Lansdowne East Lansdowne West Total Score Ranking 8

9 SPARKMAN AV S MONASTERY RD Existing Shared-Use Path/Trail Programmed Shared-Use Path/Trail Programmed Sidewalk/Streetscape Project Proposed Shared-Use Path/Trail Trail Head Proposed Shared-Use Path/Trail Endpoint Spring to Spring Trail NEW YORK AV W 17 AB 472 MINNESOTA AV E LEAVITT AV N 12 Ranking of 4 or Better Proposed Trail Ranking Hospital Public Schools CRA Boundary Parks Limits Blue Springs State Park UV2 BLUE SPRINGS AV W UV16 UV15 UV10 SPARKMAN AV N CARPENTER AV N CARPENTER AV S PARK AVE GRAVES AV W UV6 RHODE ISLAND AV W BIRCH AV DOGWOOD AV HOLLY DR W UV3 FERN DR W (E) 17 UV17 AB 15 HWY (VOLUSIA AV S) US (I) WISCONSIN AV E THORPE AV N (F) Mill Lake Loop (K) UV5 THORPE AV S (G) UV12 UV8 UV1 IRIS DR E HILLSIDE AV LANSDOWNE AV E UV12 CR 4156 (ENTERPRISE RD) FRENCH AV E RHODE ISLAND AV E HARLEY LEAVITT AV S UV12 UNIVERSITY AV CR 4145 (GRAVES AV E) SOUTHLAKE STRICKLAND BLVD UV4 UV8 D R UV7 VETERANS MEMORIAL PKWY (H) UV11 Florida Hospital Fish Memorial 4 CR 4101 KENTUCKY AV S I-4 W Deltona (J) CR 4146 (SAXON BLVD) DeBary O Miles Trail Plan Proposed Trail Ranking Figure 3 Path: E:\Data1\Orange_City_Trails\7.2_Work_in_Progress\Map_Docs\Draft\Fig_03_Proposed_Trail_Ranking_11x17.mxd - User: Jhill - Date: 12/22/2017

10 Data Collection References: East Ohio Avenue Sidewalk Bike/Ped Feasibility Study, January 2013, RS&H Graves Avenue / Park Avenue Multi-use Trail Feasibility Report, September 2005, HNTB East Graves Avenue / North Orange Avenue Sidewalks Feasibility Study, September 2015, Kimley-Horn East Graves Avenue & N. Leavitt Sidewalk Bike/Ped Feasibility Studies, June 2015, Lassiter Transportation Group East Lansdowne Avenue & South Holly Avenue Bike/Ped Feasibility Studies, October 2014, Infrastructure Engineers West French Avenue Sidewalk Feasibility Study, February 2013, Sprinkle Consulting West French Avenue Shared-Use Path Feasibility Study, February 2013, Sprinkle Consulting Volusia county Bicycling Map for the Experienced Cyclist, 2014, FDOT / River to Sea TPO River Springs Middle School Bicycle & Pedestrian School Safety Review Study: Assessment & Implementation Report, May 2011, Lassiter Transportation Group Elementary School Bicycle & Pedestrian Safety Review Study, March 2008, Hoke Design Manatee Cover Elementary School Bicycle & Pedestrian Safety Review Study Assessment Report, March 2007, Hoke Design Hand markup (highlighted) of the 2006 plan shows planning area boundary, proposed bike/ped network, and historic district boundary Hard markup (highlighted) of the Historic District with proposed bike/ped network and historic district boundary (zoomed in view) Parks Master Plan Vision, August 9, 2005, Miller Legg (includes Park Connectivity Map) Proposed Parks & Trails Master Plan (Draft) Map, revised August 13,

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

SR 934 Project Development And Environment (PD&E) Study

SR 934 Project Development And Environment (PD&E) Study SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702 Queens Mirror Circle Pedestrian Safety Improvements Quail Pond Circle Complete Street/Pedestrian Connectivity Improvements Southcot Drive Bicycle/Pedestrian Improvements Public Workshop Preliminary Plans

More information

BONITA BEACH ROAD. May 18, Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA. Greg Diserio, RLA. Tara Salmieri, AICP

BONITA BEACH ROAD. May 18, Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA. Greg Diserio, RLA. Tara Salmieri, AICP BONITA BEACH ROAD May 18, 2016 Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA Greg Diserio, RLA Tara Salmieri, AICP Toole Design Group Engineers Planners Landscape Architects Authors BONITA BEACH

More information

INGHAM COUNTY TRAILS AND PARKS TASK FORCE MEETING 2

INGHAM COUNTY TRAILS AND PARKS TASK FORCE MEETING 2 INGHAM COUNTY TRAILS AND PARKS TASK FORCE MEETING 2 October 22, 2015 Mannik and Smith Group Michigan Trails & Greenways Alliance AGENDA FOR TONIGHT 1. Project Approach, Process and Timeframe 2. Public

More information

US 380 FEASIBILITY STUDY

US 380 FEASIBILITY STUDY US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

Coast to Coast Connector Summit

Coast to Coast Connector Summit Project Partners Welcome to the Coast to Coast Connector Summit Winter Garden, Florida City Hall October 1, 2014 1 Why are we here? Objectives 1. Inform key stakeholders on the current state of the C2C

More information

Claremont Project Background and Update Community Meeting September 11, 2017

Claremont Project Background and Update Community Meeting September 11, 2017 Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions

More information

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC

More information

Bike/Pedestrian/Golf Cart Trail Recommendations for the City of Dasher

Bike/Pedestrian/Golf Cart Trail Recommendations for the City of Dasher Valdosta-Lowndes MPO Memo To: From: City of Dasher Mayor and City Council VLMPO Staff CC: Date: 7/12/2018 Re: Bike/Pedestrian/Golf Cart Trail Recommendations for the City of Dasher The City of Dasher is

More information

Header i

Header i Header i 048285014.10 Header Sub Title Body Text here. Body text here. Body text here. Section 1... 1 Executive Summary... 1 Opportunities and Constraints... 3 Overall Opportunities and Constraints Map

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S. Table 1: South Entrance Table 2: North Entrance 20th St. S 18th St. S Proposed Second Entrance Crystal Drive Existing Station Location Platform Future 4 th Track Future New Airport Connection (by others)

More information

A Presentation to: Project Advisory Group Meeting #6

A Presentation to: Project Advisory Group Meeting #6 A Presentation to: Project Advisory Group Meeting #6 March 25, 2015 Agenda Introductions Action items from last PAG meeting (February 25, 2015) Public involvement update Status of April public meetings

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

Trail Feasibility Study

Trail Feasibility Study VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way

More information

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE As the culmination of the first phase of the master planning process, this Program Development Report creates the framework to develop the Calero County

More information

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016 DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption

More information

Area Surrounding Maplewood Manor

Area Surrounding Maplewood Manor BAY CITY, MICHIGAN HOUSING COMMISSION Neighborhood Revitalization Plan Area Surrounding Maplewood Manor January 13, 2014 CITY COMMISSION DRAFT PLAN PRESENTATION BAY CITY, MICHIGAN 1 Planners Phil McKenna,

More information

FUNDED FOR CONSTRUCTION

FUNDED FOR CONSTRUCTION Priority CENTRAL FLORIDA ALLIANCE 2016 SIS HIGHWAY PROJECTS FOR PRIORITIZATION FDOT Financial Project Phase(s) Estimated Management Project Name or Length Latest Project Remaining Remaining Cost Designation

More information

Mohawk Hudson Bike Hike Trail Crossroad Connection Study

Mohawk Hudson Bike Hike Trail Crossroad Connection Study Summary Report - April 21, 2003 Mohawk Hudson Bike Hike Trail Crossroad Connection Study Summary Report Introduction The Capital District Transportation Committee (CDTC), in partnership with Albany County,

More information

Additional Economic Development Strategy submissions- Klickitat County

Additional Economic Development Strategy submissions- Klickitat County Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of

More information

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time.

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time. PREFACE The Florida Department of Transportation (FDOT) has embarked upon a statewide evaluation of transit system performance. The outcome of this evaluation is a benchmark of transit performance that

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township: D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3 ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project FEBRUARY 2019 PROJECT OVERVIEW Pattullo Bridge Replacement Project engage.gov.bc.ca/pattullobridge Artist s rendering of the proposed new Pattullo Bridge Pattullo Bridge Replacement Project 1 Priority

More information

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY PASCO COUNTY MPO JULY 2015 PROJECT OVERVIEW... INTRODUCTION EXECUTIVE SUMMARY CONTEXT... TAMPA BAY AREA, PINELLAS, & PASCO COUNTY S MULTI-USE TRAIL PLANS

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights September 11, 2013 9:00 11:00 am Trellis Hall, Citrus Heights Project Overview The City of Citrus Heights is studying the feasibility of establishing a multi use trail system within the City s 26 miles

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project JULY 2018 PROJECT OVERVIEW Pattullo Bridge Replacement Project engage.gov.bc.ca/pattullobridge Artist s rendering of the proposed new Pattullo Bridge Pattullo Bridge Replacement Project 1 Priority Need

More information

Managed Lanes, Transit Access, and Economic Development: Implementing the Region s First Highway BRT Corridor

Managed Lanes, Transit Access, and Economic Development: Implementing the Region s First Highway BRT Corridor Managed Lanes, Transit Access, and Economic Development: Implementing the Region s First Highway BRT Corridor Tim Burkhardt, AICP William Reynolds, AICP, PTP Matt Horton Who we are/astrological signs Tim

More information

MEETING MINUTES District 1 Trail Planning Meeting 1

MEETING MINUTES District 1 Trail Planning Meeting 1 MEETING MINUTES District 1 Trail Planning Meeting 1 June 1, 2017 2:00 PM 3:30 PM City of Two Harbors 2:00 Introductions Attendees: Lisa Austin, MnDOT Bryan Anderson, MnDOT Jasna Hadzic-Stanek, MnDOT Justin

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Committee Members: Page 1 of 6

Committee Members: Page 1 of 6 Auburn Trail/Ontario Pathways Trail Connector Feasibility Study Project Advisory Committee Meeting June 29, 2011 at 6:30 p.m. Canandaigua Town Hall Draft Minutes Committee Members: Ronald L. Brand, Director

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

Madison Metro Transit System

Madison Metro Transit System Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,

More information

FY 2018/19 CENTRAL FLORIDA MPO ALLIANCE - LIST OF PRIORITY PROJECTS

FY 2018/19 CENTRAL FLORIDA MPO ALLIANCE - LIST OF PRIORITY PROJECTS Priority FY 2018/19 CENTRAL FLORIDA ALLIANCE - LIST OF PRIORITY PROJECTS FY 2018-2019 SIS HIGHWAY PROJECTS FDOT Financial Management Number Project Name From To Work Description Latest Project Phase Funded

More information

MUNICIPALITY OF ANCHORAGE

MUNICIPALITY OF ANCHORAGE MUNICIPALITY OF ANCHORAGE ANCHORAGE PARKS & RECREATION Memorandum PRC 08-56 DATE: 5 August 2008 TO: FROM: SUBJECT: Parks & Recreation Commission Holly Spoth-Torres, Park Planner PRC 08-56 Far North Bicentennial

More information

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5 SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, 2012 Presented By Suzanne Phillips, P.E., FDOT District 5 Project Description The Wekiva Parkway project constructs 25 centerline miles of new toll expressway.

More information

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) F100090 Fed ID: F100090 Farmington MPO Rec Num: 4 Lead Agency: City of Aztec Proj East Arterial Route Phase 1B Fr: US 550 To: Legion Rd Project Desc.: Construct new road Category: Capacity Proj NMDOT Dist.:

More information

Regional Wayfinding Sign Strategy Thurston County Trails 2017

Regional Wayfinding Sign Strategy Thurston County Trails 2017 Regional Wayfinding Sign Strategy Thurston County Trails 2017 Partners: Members and partnering organizations of the Thurston Thrives Community Design Action Team City of Lacey, City of Olympia, City of

More information

PALM BEACH MPO. May 3, Valerie Neilson, AICP Multimodal Manager Palm Beach MPO

PALM BEACH MPO. May 3, Valerie Neilson, AICP Multimodal Manager Palm Beach MPO PALM BEACH MPO May 3, 2017 Valerie Neilson, AICP Multimodal Manager Palm Beach MPO VNeilson@PalmBeachMPO.org US-1 MULTIMODAL CORRIDOR STUDY 1. Project Overview 2. Goals 3. Timeline 4. Next Steps PROJECT

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

KING STREET PILOT STUDY PUBLIC MEETING

KING STREET PILOT STUDY PUBLIC MEETING KING STREET PILOT STUDY PUBLIC MEETING 2017.02.13 PUBLIC WORK with GEHL STUDIO / NEW YORK SWERHUN ASSOCIATES SAM SCHWARTZ CONSULTING LLC STARTING POINTS 17 1 - TRANSIT FIRST! Transit service is beyond

More information

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services Lafourche Parish Government REQUEST FOR QUALIFICATIONS Landscape Architectural Services Bayou Lafourche Parish Multi-Use Path Feasibility Study Phase 1 And Bayou Lafourche Parish Multi-Use Path Feasibility

More information

Committee. Presentation Outline

Committee. Presentation Outline CW-33-15 11/9/2015 Community and Corporate Services Committee November 10, 2015 1 Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization

More information

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Master Plan Advisory Committee (MPAC) Alternatives September 28, 2017 AGENDA Review of Previous Work Ultimate Land

More information

Restoration of Historic Streetcar Services in Downtown Los Angeles

Restoration of Historic Streetcar Services in Downtown Los Angeles Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting November 3, 2011 Introduction Local lead agency: Metro Federal lead agency: Federal Transit

More information

COMMENT PERIOD INTRODUCTION

COMMENT PERIOD INTRODUCTION To: Interested Persons From: Tom Buford File: Del Rio Trail Project Date: June 8, 2018 Community Development Department Reference: NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE DEL RIO

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

// Atlanta Streetcar System Plan

// Atlanta Streetcar System Plan // Atlanta Streetcar System Plan Citywide Conversation April 23, 2015 4/23/2015 Atlanta BeltLine // 2015 Page 1 // Overview A Supplement to the Connect Atlanta Plan and the ABI Strategic Implementation

More information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate

More information

Auke Bay Area Plan. DRAFT Transportation Chapter

Auke Bay Area Plan. DRAFT Transportation Chapter Auke Bay Area Plan DRAFT Transportation Chapter Existing Conditions This plan comes at a time of change in the transportation infrastructure within Auke Bay. Both marine and upland transportation facilities

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Multimodal Planning Studies

Multimodal Planning Studies Multimodal Planning Studies Commuter Park and Ride Study Steering Committee Meeting June 6, 2013 Agenda 1. Update on Project Schedule 2. Update on Online Interactive Mapping 3. Key Themes from the Open

More information

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW 7272 LOCAL AREA TRANSPORTATION REVIEW AND TRANSPORTATION POLICY AREA REVIEW MONTGOMERY COUNTY, MARYLAND Submitted on behalf of Carr Properties Prepared by: Wells + Associates, Inc. Submission: July 1,

More information

Waukee Trailhead Public Art and Amenities Project

Waukee Trailhead Public Art and Amenities Project Waukee - Trailhead Public Art and Amenities Project Sponsor Waukee Project Title Waukee Trailhead Public Art and Amenities Project Termini Description ( i.e. Park Avenue to 19th Street) NE Intersection

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010 Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting First meeting june 17, 2010 State of the Project Draft Environmental Impact Statement Study Phase This study is NOT the final

More information

CHAPTER FOUR: TRANSPORTATION

CHAPTER FOUR: TRANSPORTATION CHAPTER FOUR: TRANSPORTATION Barron County Comprehensive Plan: Transportation Page 61 Background Transportation facilities have a significant influence on land use, development and quality of life for

More information

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION Abstract The vision for the East Coast Greenway is an off-road urban trail system running from Calais, Maine

More information

Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP)

Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP) Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP) Project Title: Glacial Edge Trail and Downtown Pedestrian Bridge Category: G. Land Acquisition for Habitat and Recreation ENRTF

More information

PEMBERTON VALLEY RECREATIONAL TRAILS MASTER PLAN UPDATE Community Open House. April 2018

PEMBERTON VALLEY RECREATIONAL TRAILS MASTER PLAN UPDATE Community Open House. April 2018 PEMBERTON VALLEY RECREATIONAL TRAILS MASTER PLAN UPDATE Community Open House April 2018 Introductions Introductions Matt Bakker, BHA Project Coordinator Other Team Members: Liz Scroggins, Grey Owl Consulting

More information

2016 Regional Transportation Alternatives Program (TAP) Grant Application

2016 Regional Transportation Alternatives Program (TAP) Grant Application 2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017 Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

Auburn Trail/Ontario Pathways Trail Connector Feasibility Study Project Advisory Group Meeting August 25, 2011 Farmington Town Hall Approved Minutes

Auburn Trail/Ontario Pathways Trail Connector Feasibility Study Project Advisory Group Meeting August 25, 2011 Farmington Town Hall Approved Minutes Auburn Trail/Ontario Pathways Trail Connector Feasibility Study Project Advisory Group Meeting August 25, 2011 Farmington Town Hall Approved Minutes Committee Members Attending: Ronald L. Brand, Director

More information

Those with Interest in the City of Cambridge Trail System

Those with Interest in the City of Cambridge Trail System Community Services Department City Hall 50 Dickson Street, P.O. Box 669 Cambridge ON N1R 5W8 Tel: 519-740-4681 July 20, 2010 To: Re: Those with Interest in the City of Cambridge Trail System City of Cambridge

More information

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

November 11, 2009 BY  . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr. November 11, 2009 Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1 BY E-MAIL Attention: Mr. Don Herweyer Dear Mr. Herweyer: Reference: Abbott-Fernbank

More information

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Project Deliverable 4.1.3d Individual City Report - City of La Verne Pomona Valley ITS Project Project Deliverable 4.1.3d Individual City Report - City of La Verne Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

EXECUTIVE SUMMARY FALL Introduction. Findings

EXECUTIVE SUMMARY FALL Introduction. Findings EXECUTIVE SUMMARY FALL 2004 Introduction Trails are one of the most popular and highly desirable recreational resources in communities of all sizes throughout the country. In addition to providing a safe

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

GFCA Guidelines for Trail Design and Construction in Great Falls, VA

GFCA Guidelines for Trail Design and Construction in Great Falls, VA Great Falls Citizens Association (GFCA) supports the objective of planning and building a comprehensive trails system to connect the Great Falls community allowing residents to transit and recreate from

More information

Table of Recommended Functional Classification Changes East Volusia County. Page 1

Table of Recommended Functional Classification Changes East Volusia County. Page 1 Daytona 3rd St Jimmy Ann Dr Derbyshire Rd Collector URBAN Local URBAN Daytona 3rd St SR 5A/Nova Road Beach St Collector URBAN Local URBAN Daytona Bay St US 1 Beach St Collector URBAN Local URBAN Daytona

More information

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council Bridge - On State System PREVIOUS ENTRY P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 SR46598 State State Highway Fund

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

Sarasota County Trails Master Plan i

Sarasota County Trails Master Plan i Cover Page Table of Contents Table of Figures... ii List of Tables... ii 1.0 Introduction... 1 1.1 Why Build Trails?... 1 1.2 Relationship to the Statewide Trail System... 4 1.3 Trail Typologies... 5 1.4

More information

Lanie Fleischer Chester Creek Trail Improvements Public Meeting #2. February 4, 2014

Lanie Fleischer Chester Creek Trail Improvements Public Meeting #2. February 4, 2014 Lanie Fleischer Chester Creek Trail Improvements Public Meeting #2 February 4, 2014 Meeting Agenda 1) Project Team Introduction 2) Project Description 3) Present Survey & Workshop responses 4) Phase 1

More information

Northaven Trail Phase 2 Initial Project Overview

Northaven Trail Phase 2 Initial Project Overview Northaven Trail Phase 2 Initial Project Overview Partnership Project to extend existing Northaven Trail Improve Bike/Ped Connectivity On Dallas Trail Network Plan City and County Funding Oncor Texas Trails

More information

PERFORMANCE MEASURE INFORMATION SHEET #16

PERFORMANCE MEASURE INFORMATION SHEET #16 PERFORMANCE MEASURE INFORMATION SHEET #16 ARROW LAKES RESERVOIR: RECREATION Objective / Location Recreation/Arrow Lakes Reservoir Performance Measure Access Days Units Description MSIC 1) # Access Days

More information

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting Wednesday, May 31, 2017 6:30 to 8 P.M. Frank Allis Elementary School 4201 Buckeye Road Madison,

More information

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

Classifications, Inventory and Level of Service

Classifications, Inventory and Level of Service Classifications, Inventory and Level of Service Section 3 Kenmore Park, Recreation and Open Space Plan 1 P a g e Classifications and Inventory Park Classifications Kenmore classifies its parks based upon

More information

PUBLIC INPUT MEETING Heart of Navarre Tourism Corridor September 27, 2016

PUBLIC INPUT MEETING Heart of Navarre Tourism Corridor September 27, 2016 PUBLIC INPUT MEETING Heart of Navarre Tourism Corridor September 27, 2016 Meeting Overview What is the Heart of Navarre Tourism Corridor? Highway 98 from Ortega to Andorra Street County-owned portion

More information

Farmington Canal Heritage Trail Section

Farmington Canal Heritage Trail Section REVISED DRAFT TOWN COUNCIL REVIEW FINAL REPORT Farmington Canal Heritage Trail Section February 2018 PREPARED FOR IN COORDINATION WITH The Towns of Plainville and Southington, CT The City of New Britain,

More information

BICYCLE AND PEDESTRIAN COUNT PROGRAM 2016 Annual Report

BICYCLE AND PEDESTRIAN COUNT PROGRAM 2016 Annual Report BICYCLE AND PEDESTRIAN COUNT PROGRAM 2016 Annual Report TABLE OF CONTENTS A Message from the Mayor... 4 Data Count Reports... 5 Count Locations... 6 Count Locations Map... 7 Trail Data... 8 International

More information

2015 BIENNIAL MULTIMODAL TRANSPORTATION DISTRICT MONITORING REPORT

2015 BIENNIAL MULTIMODAL TRANSPORTATION DISTRICT MONITORING REPORT 215 BIENNIAL MULTIMODAL TRANSPORTATION DISTRICT MONITORING REPORT Prepared for: THE CITY OF DESTIN 42 Indian Bayou Trail Destin, FL 32541 85.837.4242 Prepared by: April 8, 216 City of Destin 215 Biennial

More information

The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m.

The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m. The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m. JOINT MEETING OF THE CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION BOARD AND LEE

More information

A1A North Corridor Multi-Use Trail. Vilano to Ponte Vedra Beach

A1A North Corridor Multi-Use Trail. Vilano to Ponte Vedra Beach A1A North Corridor Multi-Use Trail Vilano to Ponte Vedra Beach The A1A North Corridor Community Area comprised of five unincorporated areas: Porpoise Point Vilano Beach Surfside Beach North Beach South

More information

SITKA SEA WALK CRESCENT HARBOR TENNIS COURTS TO SITKA NATIONAL HISTORICAL PARK

SITKA SEA WALK CRESCENT HARBOR TENNIS COURTS TO SITKA NATIONAL HISTORICAL PARK SITKA SEA WALK CRESCENT HARBOR TENNIS COURTS TO SITKA NATIONAL HISTORICAL PARK October 10, 2011 Crescent Harbor tennis courts to Sitka National Historical Park Workshop Agenda 1.5 hours Project Introduction

More information

Mickelson Connector Feasibility Study

Mickelson Connector Feasibility Study Friends of the Norbeck PO Box 2003 Rapid City, SD 57709 www.friendsofthenorbeck.org Summary Comments on the Mickelson Connector Feasibility Study Prepared by Brian Brademeyer Submitted to Wyss Associates

More information