1 D R A F T December 6, 2016 Mr. Gregory C. Johnson, P.E. Office of the Administrator Mail Stop C-400 State Highway Administration P.O. Box 717 Baltimore MD RE: MD 978 (Hall Road) Sidewalk Funding Dear Administrator Johnson: I am writing on behalf of the City Council to bring to your attention the serious need for complete pedestrian access improvements on MD 978 (Hall Road). Hall Road is a two-lane, substandard State road identified as a Primary Road in Prince George s County s Master Plan of Transportation. This busy road, which connects to MD (Central Avenue) at both ends, is approximately 3,300 feet long and is the major point of access for several residential communities and businesses, as well as a County library. Although a Conceptual Design was completed for pedestrian improvements for the entire length (see Attachment), sidewalk improvements are under design for only a portion of the corridor. The remaining portion, from the CSX railroad tracks to the east, needs to have design funding. The City Council and neighborhood groups have worked with SHA for years to try to get a sidewalk constructed in this area. MD 978 was the subject of a Roadway Safety Audit (RSA) in The Hall Road study was one of the first RSAs conducted in SHA District 3. The Audit revealed safety issues that have only been exacerbated by the opening of the Hall Station retail center and the County library at the western end of the MD 978 corridor. There is strong community consensus, as evidenced by the large number of residents who attended the community meeting held in late 2015, in support of pedestrian improvements. The City is contributing 25% of the cost of the sidewalk now in design, and The Maryland-ational Capital Park and Planning Commission has indicated they will contribute partial funding for the remaining sidewalk east of the railroad tracks. SHA District 3 has the funds budgeted this fiscal year for construction of first phase of the sidewalk improvements. Because this situation is rather unique, with so much of the need already documented and public investment now taking place, the City is asking for your approval of design funding for the remaining section of sidewalk, east of the CSX railroad tracks, as soon as possible. Sincerely, Bowie City Council G. Frederick Robinson Mayor

2 Letter to SHA Administrator Johnson re: MD 978 (Hall Road) Sidewalk Funding 2 Attachment cc: The Honorable Douglas J.J. Peters, State Senator The Honorable Marvin E. Holmes, Delegate The Honorable Geraldine Valentino-Smith, Delegate The Honorable Joseph F. Vallario, Jr., Delegate The Honorable Todd M. Turner, County Council Member Mr. Brian Young, SHA District 3 Engineer Mr. Darrell Mobley, Director of Prince George s County DPW&T Mr. Duff Durkin, Citizens Association of South Bowie

3 JO PO ST EE GROVEHURST DURHAM PERRELL WAY DARBY DALE DIDMARTO CETRAL DULEIGH D E I G TO D EVO W O O D DO DSO IVE DTRY PI O AK ASHLEIGH STATIO POITER PARAMOT PIECR T PE JASPER HSBERG JEIGS JEIGS LAE STATIO JEIGS CETRAL POITER SOUTH WOOD FECE AD JESFO JO O JO ES FALL JEAW O O D JEI GS JERRIGTO JE LOCATIO MAP KIS JEY JEIGS 18" RCP APPROX. RIGHT--WAYLIE MD () DITCH REMOVE 3' WIDE COS OPEIG. REACE WITH 13.25' WIDE COS OPEIG (STD. O. MD ) W 24" RCP CMP ITY POLES LIE - SEE SHEET PS-02 OT FOR COSTRUIO SIDEWALK COC. SIDEWALK MATCH ITY POLE W/ SIGAL CABIETS APPROX. RIGHT- -WAYLIE RIP-RAP 18" RCP 15" RCP WALL 15" RCP STATIO IVE WALL ADJUST MAHOLE LID 42" RCP 15" RCP 15" RCP DITCH MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD THRU OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3.ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7. ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 2. O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. 3. ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4. WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5. TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. DESIGED BY AW BY F.A.P. O. AWIG O. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) COSTRUIO A PS-01 JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 1 OTTED: June 14, 2013 FILE: :\ \CADD\pHD-P001_MD.dgn

4 MATCH LIE - SEE SHEET PS-01 JO PO ST TREE EE REC. AREA GROVEHURST PERRELL TALL OAKS CROSSIG DARBY DALE DIDMARTO ETRAL DULEIGH D E I G TO D EVO W O O D DO DSO IVE DURHAM DTRY PI O AK ASHLEIGH STATIO POITER PARAMOT PIECR T PE PESIVE LAE WALL JASPER HSBERG JEIGS JEIGS LAE STATIO JEIGS CETRAL POITER RIDG TRAIL 4' PI OAK PARKW AY PI OAK PARKW AY ATIG BED LIGHT POLE JESFO JO O JO ES FALL JEAW OOD JEI GS JERRIGTO JE LOCATIO MAP KIS RIDG JEY JEIGS ITY POLE ATIG BED STOE WOOD FECE APPROX. RIGHT- CMP -WAYLIE RCP ' 3' APPROX. RIGHT--WAYLIE ATIG BED BUS STOP CROSSWALK 12" WHITE - 85 L.F. MD ( ) 9+00 ITY POLE 12:1 MAX. RELOCATED BUS STOP FROM STA COC. COC. APPROX. RIGHT- -WAY LIE S/ W MATCH LIE - SEE SHEET PS-03 OT FOR COSTRUIO MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD THRU OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. LEGED COCRETE SIDEWALK/IVEWAY GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 2.O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. 3. ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4. WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) COSTRUIO A JUE 2013 COTRA O. COCRETE REMOVAL EW CURB 3.ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 7. ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 5. TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. DESIGED BY AW BY F.A.P. O. AWIG O. PS-02 COUTY HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 2 OTTED: June 14, 2013 FILE: :\ \CADD\pHD-P002_MD.dgn

5 O-T JO GROVEHURST PERRELL JASPER DALE DIDMARTO RAL HSBERG JESFO DULEIGH D E I G TO JO O P JEIGS JO ES FALL D EVO W O O D JEAW OOD DO DSO JEIGS IVE JEI GS JERRIGTO DURHAM DTRY LAE JE KIS LOCATIO MAP PI O AK STATIO JEY POITER JEIGS JEIGS ASHLEIGH STATIO POITER CETRAL PARAMOT PIECR T PE PESIVE LAE POITER MAOR PROPERTY LIE ATIG BEDS MATCH LIE - SEE SHEET PS-02 ATIG BED +00 ' P.U.E. W APPROX.RGIH SIDEWALK MD ( ) FW- AY IL E APPROX. RIGHT--WAYLIE 1+00 ATIG BED MATCH LIE - SEE SHEET PS-04 OT FOR COSTRUIO I-BEAM MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD THRU OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3. ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7.ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 2.O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. 3. ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4.WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5. TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. DESIGED BY AW BY F.A.P. O. AWIG O. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) COSTRUIO A PS-03 JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 3 OTTED: June 14, 2013 FILE: :\ \CADD\pHD-P003_MD.dgn

6 42' STORM AI EASEMET GROVEHURST PERRELL DULEIGH E D E I G TO D EVO W O O D DO DSO IVE DURHAM DTRY PI O AK ASHLEIGH STATIO POITER PARAMOT PIECR T PESIVE LAE PA POITER LAE ASHLEIGH STATIO L SBERG JEIGS JEIGS LAE STATIO JEIGS CETRAL PE POITER MAOR ASHLEIGH STATIO COURT 15" RCP COC. #01 42' STORM AI EASEMET JO O PO D JO ES FALL JEAW O O D JEI GS JERRIGTO JE JOHSTOE KIS JEY JEIGS ' P.U.E. LOCATIO MAP MATCH LIE - SEE SHEET PS-03 ' P.U.E. ATIG BED -WAY LIE APPROX. RIGHT- S/ W S/ W PROPOSED EASEMET 15" RCP WALL VERIZO VAULT ATIG BED APPROX. RIGHT--WAYLIE 18" RCP ' P.U.E. ATIG BED SHEET PS-05 PROPERTY LIE OT FOR COSTRUIO MD () RELOCATE BUS STOP TO STA MATCH LIE - SEE APPROX. RIGHT--WAYLIE GRL WOOD FECE WOOD FECE STOE STEEL PIPES MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD THRU OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3. ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7. ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 2.O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. 3.ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4. WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5.TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. DESIGED BY AW BY F.A.P. O. AWIG O. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) COSTRUIO A PS-04 JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 4 OTTED: June 14, 2013 FILE: :\ \CADD\pHD-P004_MD.dgn

7 24" RCP E.M. GROVEHURST PERRELL DULEIGH E D E I G TO L SBERG JEIGS D EVO W O O D DO DSO JEIGS IVE DURHAM DTRY LAE PI O AK STATIO ASHLEIGH STATIO POITER JEIGS POITER CETRAL PARAMOT PIECR T PE PESIVE LAE PA POITER MAOR LAE 42' STORM AI EASEMET 24" RCP PROPERTY LIE JO O PO D JO ES FALL JEAW O O D JEI GS JERRIGTO JE JOHSTOE KIS JEY JEIGS LOCATIO MAP 42' STORM AI EASEMET WOOD FECE MATCH LIE - SEE SHEET PS-04 COC. ITY POLE ' P.U.E. MD ( ) APPROX. RIGHT--WAYLIE METERS E.M. E.M. SEE SHEET PS-06 MATCH LIE - OT FOR COSTRUIO WOOD FECE APPROX. RIGHT--WAYLIE REDCEDAR TREES MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD THRU OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3. ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7. ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 2.O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. 3.ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4. WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5. TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. DESIGED BY AW BY F.A.P. O. AWIG O. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) COSTRUIO A PS-05 JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 5 OTTED: June 14, 2013 FILE: :\ \CADD\pHD-P005_MD.dgn

8 LEIGH G TO D EVO W O O D DO DSO IVE M DTRY PI O AK ASHLEIGH STATIO POITER PARAMOT PIECR T PESIVE LAE PARKIG POITER LAE WETLAD BUFFER WETLAD 1 JEIGS RG JEIGS LAE STATIO JEIGS CETRAL PE POITER MAOR MATCH LIE - SEE SHEET PS-05 ' P.U.E. HISTORIC BAR PROPERTY LIE RELOCATE SIG (12 S.F.) GRL 80" MD ( ) APPROX. RIGHT--WAYLIE DIAMETER TREE SIG ATIG BED TRAFFIC BARRIER OVERHEAD RAIL SIGAL L.F. 15" CMP EXTESIO APPROX. RIGHT- 32' -WAYLIE STD. O. MD "RCP WASTE PILE 20' - + ELEVATED PEDESTRIA WALKWAY WITH RAILIGS GAS PIPELIE MARKER TREE LIE STEEP SLOPE APPROXIMATE LOCATIO MATCH LIE - SEE SHEET PS-07 GAS PIPELIE TEST STATIO TREE LIE RAIL CROSSIG SIGAL GAS PIPELIE MARKER ADA COMIAT PEDESTRIA RAIL CROSSIG D JO ES FALL JEAW OOD JEI GS JERRIGTO JE JOHSTOE KIS JEY JEIGS LOCATIO MAP OT FOR COSTRUIO PARKIG LOT BELAIR VETERIARY HOSPITAL MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD THRU OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3. ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7.ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 2. O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. 3. ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4. WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5. TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. DESIGED BY AW BY F.A.P. O. AWIG O. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) COSTRUIO A PS-06 JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 6 OTTED: June 14, 2013 FILE: :\ \CADD\pHD-P006_MD.dgn

9 LEIGH G TO D EVO W O O D DO DSO IVE M DTRY PI O AK ASHLEIGH STATIO POITER PARAMOT PIECR T PESIVE LAE PARKIG POITER LAE TREE LIE WETLAD 1 APPROXIMATE 0 YEAR FLOODAI BOUDARY APPROXIMATE LOCATIO GAS PIPELIE COLLIGTO BRACH ELEVATED PEDESTRIA WALKWAY L.F. TREE LIE D JEIGS RG JO ES FALL JEAW OOD JEIGS JEI GS JERRIGTO LAE JE JOHSTOE KIS STATIO JEY POITER JEIGS JEIGS CETRAL LOCATIO MAP PE MAOR MATCH LIE - SEE SHEET PS WETLAD BUFFER TRAFFIC BARRIER APPROX. RIGHT--WAYLIE APPROX. RIGHT--WAYLIE HEADWALL TREE LIE TRAFFIC BARRIER MD ( ) ITY POLE TREE LIE TREE LIE HEADWALL TRAFFIC BARRIER TRAFFIC BARRIER MATCH LIE - SEE SHEET PS-08 OT FOR COSTRUIO APPROX. RIGHT--WAYLIE COLLIGTO BRACH WETLAD 3 WETLAD BUFFER WETLAD BUFFER WETLAD 2 MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD THRU OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3. ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7. ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 2.O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. 3.ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4.WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5. TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. DESIGED BY AW BY F.A.P. O. AWIG O. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) COSTRUIO A PS-07 JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 7 OTTED: June 14, 2013 FILE: :\ \CADD\pHD-P007_MD.dgn

10 D EVO W O O D DO DSO IVE DTRY PI O AK ASHLEIGH STATIO POITER PARAMOT PIECR T PESIVE LAE POITER ARKIGTO LAE PE MAOR POITER JEIGS JEIGS LAE STATIO JEIGS CETRAL POITER PAR SIDEWALK JEAW OOD JEI GS JERRIGTO JE KIS JEY JEIGS MATCH LIE - SEE SHEET PS-07 STOE GAS PIPELIE MARKER ITY CABIET ITY POLE TRAFFIC BARRIER TRAFFIC BARRIER ITY POLE APPROX. RIGHT--WAY LIE G STOE GAZEBO WALL REMOVE CURB CROSSWALK 12" WHITE (96 L.F.) S/ W POITER IVE MD ( ) UTLITY POLE SIG TREE LIE ITY POLE COC. RELOCATE CURB AD GUTTER STD. O. MD RELOCATED BUS STOP FROM STA APPROX. RIGHT- -WAY LIE MATCH LIE - SEE SHEET PS-09 JOHSTOE LOCATIO MAP OT FOR COSTRUIO WASH. APPROX. RIGHT--WAYLIE RAIL TIES GAS STRUURE WETLAD 3 WETLAD BUFFER WETLAD BUFFER APPROXIMATE 0 YEAR FLOODAI BOUDARY MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD THRU OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. 2. O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3.ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7.ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 3. ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4. WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5. TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO THE USABLE WIDTH THE SIDEWALK, TEMPORARY PATHWAY OR OTHER PEDESTRIA FACILITY. FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) DESIGED BY AW BY F.A.P. O. AWIG O. DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) COSTRUIO A PS-08 JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 8 OTTED: June 14, 2013 FILE: :\ \CADD\pHD-P008_MD.dgn

11 PS- WOOD FECE JEIGS I D EVO W O O D JEI GS JERRIGTO DTRY LAE JE KIS JOHSTOE PI O AK STATIO JEY POITER JEIGS JEIGS ASHLEIGH STATIO POITER CETRAL PARAMOT PIECR T PE PESIVE LAE POITER MAOR LAE KIGTO PE YPA PARKLA PRESIDIO WAY LOCATIO MAP PS-08 JUIO BOX RCP APPROX. RIGHT--WAYLIE TREE LIE DITCH OT FOR COSTRUIO MATCH LIE - SEE SHEET ITY POLE TREE LIE MD ( ) 48'- + STD. O. MD ADJUST ATIG BED ITY POLE MATCH LIE - SEE SHEET WETLAD BUFFER RELOCATE TALL OAKS EARLY LEARIG CETER SIG 2' OSE DOW CURB S/ W APPROX. RIGHT--WAYLIE GATE WETLADS PARKIG LOT EXPRESS MART TALL OAKS EARLY LEARIG CETER MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD THRU OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. 2.O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3. ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7. ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 3. ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4. WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5. TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) DESIGED BY AW BY F.A.P. O. AWIG O. DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) COSTRUIO A PS-09 JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 9 OTTED: June 14, 2013 FILE: :\ \CADD\pHD-P009_MD.dgn

12 SS MATCH LIE - SEE SHEET PS-09 D EVO W O O D O AK ASHLEIGH STATIO POITER PARAMOT PIECR T PESIVE LAE POITER LAE GTO YPACKER ECHO PE MAOR PEM B APPROX. RIGHT--WAYLIE LAE JE KIS JOHSTOE STATIO JEY JEIGS JEIGS CETRAL POITER PARKLAW PRESIDIO WAY PEGRO VE 978 DITCH TREE LIE BOWIE n LOCATIO MAP MD ( ) RELOCATE BUS STOP TO STA RELOCATE BUS STOP SIG ITY POLE TRAFFIC BARRIER OT FOR COSTRUIO BOLLA (TYP.) APPROX. RIGHT- -WAYLIE EXPRESS MART S/ W PARKIG LOT DITCH DITCH MD (CETRALUE) MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD THRU OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. 2.O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3. ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7. ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 3. ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4.WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5.TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) DESIGED BY AW BY F.A.P. O. AWIG O. DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) COSTRUIO A PS- JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. OTTED: June 14, 2013 FILE: :\ \CADD\pHD-P0_MD.dgn

Northern Branch Corridor DEIS December Appendix B: Site Plans of Project Elements

Northern Branch Corridor DEIS December Appendix B: Site Plans of Project Elements orthern Branch Corridor DEIS December 211 Appendix B: Site Plans of Project Elements EMERSO L 8' x 1' CAR SHOP SUB PROP TRACK LOCATIO (TYP) CAR WASH 25' x 3' CAR SHOP POSSIBLE DETETIO LOCATIO 43RD ST 5TH

More information

PROJECT: Gold House 819 Cerrito Street

PROJECT: Gold House 819 Cerrito Street PROJECT: Gold House 819 Cerrito Street PROJECT DESCRIPTIO THIS PROJECT PROPOSES THE COVERSIO OF A EXISTIG 2-CAR ITO A SIGLE CAR AD ADJACET ETRY TO THE HOME APPLICAT/ARCHITECT DEVI DUTTA-CHOUDHURY, AIA

More information

ballfields 5-8 red hook park

ballfields 5-8 red hook park ballfields 5- red hook park Bordered by Lorraine, Hicks, Henry, and Bay Streets In the Borough of Brooklyn Public Design Commission- Concept Review Submission May, 201 TRC Engineers, Inc. and Parks Capital

More information

HEFT/I-75 INTERCHANGE ROADWAY PLAN HEFT WB Feet WETLAND IW95 POND MD6-3 POND MD6-2 PROP. L/A R/W LINE CS MD-6

HEFT/I-75 INTERCHANGE ROADWAY PLAN HEFT WB Feet WETLAND IW95 POND MD6-3 POND MD6-2 PROP. L/A R/W LINE CS MD-6 RAMP H-4 415-183 POD MD6-2 MATCH LIE STA. 436+37.22 435 POD MD6-3 WETLAD IW95 SFWMD C-9 CAAL 535 RAMP H-5 600 825 765 RAMP H-7 PROP. L/A R/W LIE 540 605 430 810 815 820 RAMP H-6 RAMP H-8 CS MD-6 POD MD6-1

More information

RECURRENT FLIGHT SCHOOL SECURITY AWARENESS (FSSA) TRAINING

RECURRENT FLIGHT SCHOOL SECURITY AWARENESS (FSSA) TRAINING RECURRENT FLIGHT SCHOOL SECURITY AWARENESS (FSSA) TRAINING By completig Sectios 1 through 4 of this program ad the accompayig documetatio, you will have met the requiremets of 49 C.F.R. 1552.23(d), which

More information

ELLICOTT STATION- BATAVIA, NY

ELLICOTT STATION- BATAVIA, NY Property Overview: ew Development Project in the Heart of Downtown Batavia Part of a Live - Work - Play Mixed Use Campus Class A Office Space Ground Floor Space with 18 Ceilings Close to I-90, Major Arteries

More information

BICYCLE AND PEDESTRIAN IMPROVEMENTS DOBBIN ROAD/ MCGAW ROAD

BICYCLE AND PEDESTRIAN IMPROVEMENTS DOBBIN ROAD/ MCGAW ROAD BICYCLE AD PEDESTRIA DOBBI AD/ MCGAW AD IDE AWIGS GEERAL OTES 1 TITLE 3rd ELEIO DISTRI 2 SITE P HOWA COUTY, MARYD 1. 2. THE COTRAOR SHALL OTIFY THE HOWA COUTY DEPARTMET PUBLIC WORKS/BUREAU EGIEERIG COSTRUIO

More information

203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'

More information

BUILDING / RESTROOMS WALKING LOOP SIGNALIZED AT- GRADE CROSSING

BUILDING / RESTROOMS WALKING LOOP SIGNALIZED AT- GRADE CROSSING A WADIG POOL SPLASH PAD BUILDIG / RESTROOMS ADULT FITESS MULTI-USE FIELD MULTI-USE DIAMOD WALKIG LOOP SIGALIZED AT- GRADE CROSSIG AMPHITHEATER/ SEATIG FLATTEED SITE - AT GRADE CROSSIG (REMOVAL OF EXISTIG

More information

Avonmouth, BRISTOL. Design AND build opportunities for up to 1.1 MILLION sq ft in an outstanding strategic location

Avonmouth, BRISTOL. Design AND build opportunities for up to 1.1 MILLION sq ft in an outstanding strategic location K RD BAN E MER portside N LANE NE LA ks Avomouth, BRISTOL ks KIN BO g oli Co k U E W GS YR AR ND ON ST WESTO D OA KINGS GY ER E EN ENTR C k Desig AND build opportuities for up to 1.1 MILLION sq ft i a

More information

PICNIC AREA PLAY AREA. Wirth/ Victory Memorial Parkway Regional Trail. Zenith Ave N

PICNIC AREA PLAY AREA. Wirth/ Victory Memorial Parkway Regional Trail. Zenith Ave N Victory Memorial Park PICIC PLAY LRT STATIO TRAIL COECTIOS RECOIFUGRED ITERSETIO AT GOLDE VALLEY RD & THEODORE WIRTH PKWY 0 1,000 Broadway Theodore Wirth Parkway 29th Ave PICIC PLAY Wirth/ Victory Memorial

More information

Warehouse District/Hennepin Ave. Rosedale Transit Center. Nicollet Mall. Government Plaza. 3rd St. U.S. Bank Stadium. Stadium Village Prospect Park

Warehouse District/Hennepin Ave. Rosedale Transit Center. Nicollet Mall. Government Plaza. 3rd St. U.S. Bank Stadium. Stadium Village Prospect Park METO System Big Lake Elk iver amsey Aoka Coo apids/iverdale MISSISSIPPI IVE Oak Grove Pkwy Existig ad Plaed 93rd Ave 85th Ave BOOKLYN PAK Trasitways Brookly Blvd Fridley Hopkis Shady Oak 63rd Ave Bass

More information

25 th Avenue Grade Separation. September 13, 2017

25 th Avenue Grade Separation. September 13, 2017 25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12 COASTAL CONSERVANCY Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12 File No. 11-039-001 Project Manager: Betsy Wilson RECOMMENDED ACTION: Authorization to disburse

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

UNDER NEW OWNERSHIP AND MANAGEMENT

UNDER NEW OWNERSHIP AND MANAGEMENT UNDER NEW OWNERSHIP AND MANAGEMENT 2 2 0 1 A N D 2 2 3 1 E A S T C A M E L B A C K R O A D P H O E N I X, A R I Z O N A Owed ad Operated by Exclusively Represeted by Camelback Road Locatio Features Located

More information

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL

More information

Welcome to Sage Hill Corner

Welcome to Sage Hill Corner elcome to Sage Hill Corner ETERPRISE SOLUTIOS Be a part of the growing community SAGE VALLEY BLVD & SAGE HILL BLVD, CALGARY, AB Partnership. Performance. Hani Abdelkader 403.232.4321 hani.abdelkader@avisonyoung.com

More information

Madison Metro Transit System

Madison Metro Transit System Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,

More information

Hospital Link Project Project Update Winter 2018

Hospital Link Project Project Update Winter 2018 Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

2018 Cub Scout Day Camp Parents Guide Passport to Adventure

2018 Cub Scout Day Camp Parents Guide Passport to Adventure 2018 Cub Day Camp Parets Guide Passport to Adveture Everythig you eed to kow: What to brig Cotact Ifo Sample Schedule Advacemet Leadership FAQs Sig up with your pack olie at the Hawkeye Area Coucil website:

More information

25 th Avenue Grade Separation. December 13, 2017

25 th Avenue Grade Separation. December 13, 2017 25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg) RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information

More information

Prairie Village Parks and Recreation Master Plan Individual Park Plans and Details

Prairie Village Parks and Recreation Master Plan Individual Park Plans and Details Prairie Village Parks and Recreation Master Plan Individual Park Plans and Details This master plan report section provides additional insight into the improvement recommendations that have been created

More information

WHY ARE YOU HERE? To provide feedback on the Area Redevelopment Plan.

WHY ARE YOU HERE? To provide feedback on the Area Redevelopment Plan. WELCOME WELCOME TO THE SECOD CETRE I THE PARK PUBLIC OPE HOUSE WHY ARE YOU HERE? To provide feedback on the Area Redevelopment Plan. WHAT IS THE PROJECT? The Centre in the Park Area Redevelopment Plan

More information

2017 Chinese Youth Camp The University of Texas at Austin Austin, Texas Sunday, July 23 Saturday, July 29 Sunday, July 23 is the FIRST DAY of Camp!

2017 Chinese Youth Camp The University of Texas at Austin Austin, Texas Sunday, July 23 Saturday, July 29 Sunday, July 23 is the FIRST DAY of Camp! 2017 Chiese Youth Camp The Uiversity of Texas at Austi Austi, Texas Suday, July 23 Saturday, July 29 Suday, July 23 is the FIRST DAY of Camp! CHECK IN PROCESS (12:00PM 2:00PM) Check i starts at 12:00pm

More information

VICINITY MAP END PROJECT BEGIN PROJECT Middle Fork Campground Middle. Lake. Moolock. Fork. Trailhead. Lake Nadeau SMC.

VICINITY MAP END PROJECT BEGIN PROJECT Middle Fork Campground Middle. Lake. Moolock. Fork. Trailhead. Lake Nadeau SMC. htr $PATH$ $DATE$ Designed by: B. W ACKER o ~ 63.4m.i Bend BEGI 7+65.00 REFERECE: APPLICAT: Federal Highway Administration ADJACET PROPERTY OWERS:. Washington Department of atural Resources (7+65 to 487+0)

More information

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017 LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20

More information

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting Wednesday, May 31, 2017 6:30 to 8 P.M. Frank Allis Elementary School 4201 Buckeye Road Madison,

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

9975 S. EASTERN AVE For Lease: HENDERSON EAST GREEN VALLEY. Highly Visible Retail Center at ANTHEM

9975 S. EASTERN AVE For Lease: HENDERSON EAST GREEN VALLEY. Highly Visible Retail Center at ANTHEM D S DECATUR BLVD RKWAY S PECOS ROAD 5 UIO PACIFIC RR CACTUS AVE W RUSSELL ROAD ECOCK HILLS AVE 9975 S. EASTER AVE. Las Vegas, ULV evada 89052 W SILVERADO RACH BLVD DEA MARTI DR SOUTHER HIGHLADS SOUTHER

More information

Mason Street Bike/Pedestrian Trail Project

Mason Street Bike/Pedestrian Trail Project Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016 RELEASE: IMMEDIATE June 10, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

A UNIQUE PRE-LETTING OPPORTUNITY

A UNIQUE PRE-LETTING OPPORTUNITY THE GENERATOR BUILDING BRISTOL A UNIQUE PRE-LETTING OPPORTUNITY TO BE COMPREHENSIVELY RE-MODELLED TO PROVIDE 30,611 SQ FT OF OUTSTANDING, CONTEMPORARY OFFICE SPACE A uique opportuity Uique pre-lettig

More information

FOR LEASE 5431 H Street Sacramento, CA

FOR LEASE 5431 H Street Sacramento, CA PROPERTY PROFILE Lot Size Building Size 0.128 acres ±1,089 SF AP 004-0341-009 Land Use C-2 General Commercial Zone MARKET HIGHLIGHTS Great access to both Highway 50 & Interstate 80 Within close proximity

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

New Jersey Department of Transportation

New Jersey Department of Transportation Administration, Organization, Records Management & Information Requests 16:1A-4.4(a) Copying fees - Records Page 1 10: $0.75 per page Page 11 20: $0.50 per page Over 20 pages - $0.25 per page 16:1A-4.5(c)

More information

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 Welcome & Introductions - Deb Zywna AGENDA FY 20 Resort CIP Proposed Projects - Kathy Warren ORDFBC Design Guidelines

More information

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell) RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)

More information

SAN RAFAEL City Council January 20, 2015

SAN RAFAEL City Council January 20, 2015 SONOMA MARIN AREA RAIL TRANSIT SMART CENTRAL SAN RAFAEL STATUS UPDATE SAN RAFAEL City Council January 20, 2015 CENTRAL SAN RAFAEL SMART SOUTH OF PUERTO SUELLO TUNNEL 1. Active Construction 2. Construction

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth) RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

College of Lake County West Washington Street Grayslake, Illinois 60030

College of Lake County West Washington Street Grayslake, Illinois 60030 March 4, 2014 VIA EMAIL College of Lake County 19351 West Washington Street Grayslake, Illinois 60030 Re: Master Plan Projects Architect s Project umber: 214009.00 Schematic Design Meeting #8 Minutes Summary

More information

CAMPUS OAKS TOWN CENTER

CAMPUS OAKS TOWN CENTER RETAIL AERIAL AVAILABLE FOR LEASE CAMPUS OAKS TOW CETER SEC BLUE OAKS BLVD & WOODCREEK OAKS BLVD ROSEVILLE, CA James A. Teare, CRX, CLS Senior Director +1 916 329 1548 james.teare@cushwake.com LIC #01111851

More information

0.86 AC of Freeway Visible Retail Land Available For Ground Lease or BTS

0.86 AC of Freeway Visible Retail Land Available For Ground Lease or BTS .86 AC of Freeway Visible Retail Land Available For round Lease or BTS Elk Park Village Pad Information Drive-Thru Pad SIZE ZOI.86 AC (±37,462 SF) C - eneral Commercial AP 125-3-33 ADDRESS 9679 E. Stockton

More information

Backpack. Travel Gear for the Avid Golfer. Limited One-Year Warranty

Backpack. Travel Gear for the Avid Golfer. Limited One-Year Warranty Limited Oe-Year Warraty Acushet Compay warrats its Titleist products for a period of oe year from the date of purchase agaist defects i materials or workmaship. Should your Titleist product fail to perform

More information

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. REPORT FOR ACTION Construction Staging Area - 81 Bay Street Date: December 11, 2017 To: Toronto and East York, Community Council From: Acting Director, Transportation Services Toronto and East York District

More information

LAKE MOUNTAIN PRELIMINARY

LAKE MOUNTAIN PRELIMINARY VICINITY MAP VICINITY MAP PREPARED FOR:. THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN ON THESE S WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS, TO THE

More information

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702 Queens Mirror Circle Pedestrian Safety Improvements Quail Pond Circle Complete Street/Pedestrian Connectivity Improvements Southcot Drive Bicycle/Pedestrian Improvements Public Workshop Preliminary Plans

More information

AGENCY NAME TRANSPORTATION

AGENCY NAME TRANSPORTATION TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller

More information

COPTHALL AND MILL HILL OPEN SPACES MASTERPLAN

COPTHALL AND MILL HILL OPEN SPACES MASTERPLAN COPTHALL AD MILL HILL OPE SPACES MASTERPLA PHASE REPORT MASTERPLA BRIEF VISIO The masterplan development has considered the original brief and translated this into the following key vision oucomes for

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

Action Recommendation: Budget Impact:

Action Recommendation: Budget Impact: City of Fayetteville Staff Review Form Matt Mihalevich 1/16/2019 DEVELOPMENT SERVICES (620) Submitted By 2019 0050 Legistar File ID February 5th, 2019 City Council Meeting Date Agenda Item Only N/A for

More information

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date SPECIAL COMMITTEE ON US ROUTE NUMBERING MEETING MINUTES FOR OCTOBER 17, 2013 AND REPORT TO SCOH OCTOBER 18, 2013 SHERATON DOWNTOWN DENVER, DENVER, COLORADO ADDENDUM OCTOBER 28, 2013 The meeting of the

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON EAST RDICA AVENUE FOR THE LOCATION MAP STANDARD SYMBOLS FEATURE EISTING PROPOSED BENCHMARK BM/TBM SHEET INDE. BM/TBM TITLE SHEET CONCRETE R.O.W. MONUMENT

More information

Datum on benchmarks All benchmarks with a Township name and number are on 1929 datum:. All benchmarks with a four-digit number are on 1988 datum:

Datum on benchmarks All benchmarks with a Township name and number are on 1929 datum:. All benchmarks with a four-digit number are on 1988 datum: Datum on benchmarks All benchmarks with a Township name and number are on 1929 datum:. All benchmarks with a four-digit number are on 1988 datum: LAWRENCE 2 Destroyed 8/29/05 TG General coordinates: 10800E

More information

2. RESOLUTION TO CLOSE MEETING

2. RESOLUTION TO CLOSE MEETING THE CORPORATION OF THE CITY OF VERNON A G E N D A To deliver effective and efficient local government services that benefit our citizens, our businesses, our environment and our future REGULAR OPEN MEETING

More information

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,

More information

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

BID FORM. Bid by: Name of Bidder. Address:  Address: To the Texas Department of Transportation hereinafter called the Agent. BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway

More information

TRAIL ANNUAL REPORT

TRAIL ANNUAL REPORT TRAIL ANNUAL REPORT 2016-17 Identify Undeveloped projects identified in the City s Greenprint or trail database 15.90 miles Study Projects that have been or are currently being studied to determine a feasible

More information

Memorandum / Letter of Intent

Memorandum / Letter of Intent VERONA WAUKESHA KENOSHA APPLETON WESTON Memorandum / Letter of Intent To: Adam Sayre, Director of Planning & Development, City of Verona From: Kevin Yeska, JSD Professional Services, Inc. www.jsdinc.com

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

THREE MILE PLAN TOWN OF SUPERIOR COLORADO THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate

More information

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: 5.e Meeting Date: October 3, 2016 Department: Public Works SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Director of Public Works TOPIC: QUIET ZONE DESIGNATION City Manager

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

UP TO 13,854 SQ FT (1,287 SQ M) OF GRADE A OFFICE SPACE AVAILABLE

UP TO 13,854 SQ FT (1,287 SQ M) OF GRADE A OFFICE SPACE AVAILABLE UP TO 13,854 SQ FT (1,287 SQ M) OF GRADE A OFFICE SPACE AVAILABLE Mell Square 0.2 miles / 4 mi walk* Over 90 shops ad restaurats, plus parkig for 950 cars Touchwood 0.1 miles / 3 mi walk* Over 80 shops,

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 6/23/2016 Lucy V. Barnsley Elementary School Addition, Mandatory Referral MR2016027

More information

Area Surrounding Maplewood Manor

Area Surrounding Maplewood Manor BAY CITY, MICHIGAN HOUSING COMMISSION Neighborhood Revitalization Plan Area Surrounding Maplewood Manor January 13, 2014 CITY COMMISSION DRAFT PLAN PRESENTATION BAY CITY, MICHIGAN 1 Planners Phil McKenna,

More information

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S. Table 1: South Entrance Table 2: North Entrance 20th St. S 18th St. S Proposed Second Entrance Crystal Drive Existing Station Location Platform Future 4 th Track Future New Airport Connection (by others)

More information

RUNWAY OPERATIONS: Computing Runway Arrival Capacity

RUNWAY OPERATIONS: Computing Runway Arrival Capacity RUNWAY OPERATIONS: Computig Ruway Arrival Capacity OR750 /SYST660 USE Ruway Capacity Spreadsheet Sprig 2008 Lace Sherry 1 CENTER FOR AIR TRANSPORTATION SYSTEMS RESEARCH Backgroud Air Trasportatio System

More information

Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:

Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max: Page 1 of 20 518045 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025600 FIELD OFFICE AND LABORATORY (TYPE A) 3 012340 FOUNDATION STABILIZATION (SET PRICE) 4 025323 MOBILIZATION 5

More information

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features:

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features: Property Features: Free - Standing; Entitled 53,8 SF;,311 SF Office (3) Dock High Loading Rare, New Planned Wholesale Warehouse Corner Location (Live Oak Ave. & Washington Dr.) 1 Block South Of Valley

More information

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 Section 3-04 Cross Sectional Elements TABLE OF CONTENTS INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 CROSS-SECTIONAL ELEMENTS...3 Traveled Way...3 Shoulder...3 Surfacing Taper...3

More information

BALLAS METROBUS CENTER

BALLAS METROBUS CENTER BALLAS METROBUS CETER Effective Date: March 14, 2016 I-64 Ramp Ballas Rd SPEED LIMIT 10 Call A Ride Ballas Transfer Center 64 64 Catalan Loop Effective Date: August 30, 2010 W E S Broadway 48 S. Lindbergh

More information

1133 W. MORSE BLVD, WINTER PARK, FL OFFICE / MEDICAL SPACE FOR LEASE

1133 W. MORSE BLVD, WINTER PARK, FL OFFICE / MEDICAL SPACE FOR LEASE 1133 W. MORSE BLVD, WINTER PARK, FL 32789 OFFICE / MEDICAL SPACE FOR LEASE PROPERTY OVERVIEW OFFICE / MEDICAL BUILDING IN GREAT WINTER PARK LOCATION UP TO 11,361± SF (ENTIRE BUILDING) AVAILABLE FIRST &

More information

Carport Syste. Carport System. Formsteel Industries. Innovative. building. systems

Carport Syste. Carport System. Formsteel Industries. Innovative. building. systems Carport Syste Carport System Formsteel Idustries Carports Multi Etry Carports Covered Yards Walkways Shelters Boat & Camperva Covers Iovative buildig systems Itroducig Itroducig the Formsteel Formsteel

More information

Waterloo Court 31 WATERLOO ROAD, WOLVERHAMPTON WV1 4DJ

Waterloo Court 31 WATERLOO ROAD, WOLVERHAMPTON WV1 4DJ Waterloo Court 31 WATERLOO ROAD, WOLVERHAMPTON WV1 4DJ INVESTMENT SUMMARY Promiet city cetre multi let office buildig 41,053 sqft of accommodatio over seve floors 77 secure car spaces o site (1:522 sqft)

More information

ADA Checklist for Emergency Shelters

ADA Checklist for Emergency Shelters U.S. Department of Justice Civil Rights Division Disability Rights Section Americans with Disabilities Act ADA Checklist for Emergency Shelters July 26, 2007 Reproduction Reproduction of this document

More information

Birthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority.

Birthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority. TITUSVILLE Birthplace of the Oil Industry - 1895 Trail Town - 2013 City of Titusville Fleming Park Crawford County, Pennsylvania for the Authority By: STIFFLER McGRAW Engineers Surveyors Architects & TABLE

More information

Fuller Road/Fuller Heights Road Improvements

Fuller Road/Fuller Heights Road Improvements Transportation Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4M This project will widen Fuller Road, which is the entrance road serving the Quantico Marine Corps Base, the Town of

More information

EXCITING DEVELOPMENT/ OWNER-OCCUPIER OPPORTUNITY IN THE HEART OF KENTISH TOWN. THE SHED Kentish Town NW5

EXCITING DEVELOPMENT/ OWNER-OCCUPIER OPPORTUNITY IN THE HEART OF KENTISH TOWN. THE SHED Kentish Town NW5 EXCITING DEVELOPMENT/ OWNER-OCCUPIER OPPORTUNITY IN THE HEART OF KENTISH PROPERTY SUMMARY Freehold Office use (B1a) Osite parkig for 6 cars, additioal parkig available o Regis Road Sold with the beefit

More information

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg) RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information

More information

October 31, 2014 Chuck McGinness, (954)

October 31, 2014 Chuck McGinness, (954) From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October

More information

Community Development

Community Development Community Development City & Borough of Juneau Community Development 155 S. Seward Street Juneau, AK 99801 (907) 586 0715 Phone (907) 586 4529 Fax DATE: February 11, 2016 TO: FROM: Planning Commission

More information

Wichita Falls MPO - MTP Project List 1 of 6

Wichita Falls MPO - MTP Project List 1 of 6 Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS

More information

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction PRESENTED TO Town of Middlebury, VT PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction Meeting with you today Brian Carpenter, Middlebury Selectboard Chair Jim Gish, Middlebury

More information

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail Lenexa: overview TRAFALGAR PARK 78: p.140 As the Westport Route crosses over Lenexa's boundaries with Olathe and Overland Park several times, approximately 2.75 or 3 miles of the historic route of the

More information

22-23 Pavement Marking Items. (Pages 7 & 8 removed)

22-23 Pavement Marking Items. (Pages 7 & 8 removed) 22-23 Pavement Marking Items (Pages 7 & 8 removed) SUMMARY OF TRAFFIC CONTROL DEVICES (FOR INFORMATION ONLY) All traffic control devices shall be placed in accordance with the applicable

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Capital Improvement Plan

Capital Improvement Plan PROGRAM DESCRIPTION: The represents City Council approved projects and includes each of the project's total costs and the estimated funding requirements for the next five years. Projects are funded by

More information

OUR EXISTING PARK SYSTEM

OUR EXISTING PARK SYSTEM OUR EXISTING PARK SYSTEM People who live closer to parks report better metal health eve if they do t actually exercise there. This may be particularly true for parks with a lot of trees, grass, ad other

More information

Montgomery Citizens Advisory Committee Meeting Minutes

Montgomery Citizens Advisory Committee Meeting Minutes Voting Members Mr. James Brown Ms. Ruth Ott Mr. Crews Reaves Mr. Blair Rehnberg Mr. Charles Rowe Mr. Rich Beauchamp Ms. Gracie Stroud Mr. Theodore White Montgomery Citizens Advisory Committee Meeting Minutes

More information

DELIVERED GREENFIELD PARKWAY Garner, North Carolina 1001 GREENFIELD NORTH CONTACT:

DELIVERED GREENFIELD PARKWAY Garner, North Carolina 1001 GREENFIELD NORTH CONTACT: DELIVERED 1001 GREENFIELD PARKWAY Garner, North Carolina OPTIONAL DOOR PAIR 50'-0" 750-0 200'-0" 50 50 FIRE PUMP ELEC SLOPE DN ROOF ACCESS LADDER SLOPE DN SITE PLAN 151,642 SF OPTIONAL DOOR PAIR 750'-0"

More information

ADDENDUM NO. TWO AB

ADDENDUM NO. TWO AB ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County

More information

Construction Staging Area Blue Jays Way (357 King Street West)

Construction Staging Area Blue Jays Way (357 King Street West) REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto

More information

URBAN AND LANDSCAPE DESIGN - PRELIMINARY CONCEPT COBHAM DRIVE CYCLEWAY - MARCH 2017

URBAN AND LANDSCAPE DESIGN - PRELIMINARY CONCEPT COBHAM DRIVE CYCLEWAY - MARCH 2017 URBA AD LADSCAPE DESIG - PRELIMIARY COCEPT COBHAM DRIVE CYCLEWAY - MARCH 2017 LADSCAPE COTEXT WELLIGTO PRE 1855 AKAU TAGI - EVAS BAY GS Science Reference: C15244/24 Photograph by Lloyd Homer URBA & LADSCAPE

More information