Temagami First Nation / Teme-Augama Anishnabai. Request for Proposals for Consulting Services to. undertake a. Master Land Use Plan

Size: px
Start display at page:

Download "Temagami First Nation / Teme-Augama Anishnabai. Request for Proposals for Consulting Services to. undertake a. Master Land Use Plan"

Transcription

1 Request for Proposals for Consulting Services to undertake a Master Land Use Plan for Bear Island Reserve Lands and the Lands Set Aside Closing Date and Time: August 10, 2018 at 11:59 p.m.

2 1. Overview are excited to be embarking on their land use planning exercise and are requesting proposals from qualified consultants to prepare a Master Land Use Plan for Bear Island Reserve Lands and the Lands Set Aside. 2. Temagami First Nation s Vision and Principles Vision Statement: As the original stewards of Daki Menan, Temagami First Nation will incorporate the teachings of our ancestors, the importance of maintaining the ecosystem s integrity and the need to make a modern living when contemplating modern forestry, resource development and land use practices. By doing so, present and future generations will realize the social and economic benefits of sustained life and sustainable development. Definitions of Principles: 1. Teachings, since time immemorial, have had a special relationship with Daki Menan which is embodied in traditional teachings passed on by our Elders and ancestors. 2. Stewardship to care for the Daki Menan and making a living from the land in a respectful and honourable manner, whereby the ecosystem s integrity is maintained. Stewardship also involves the understanding of the interconnectedness of all things. 3. Sustained Life - whereby all life is protected and the natural integrity of all life forms in and on the land are maintained. 4. Sustainable Development development of the land for current generations which does not compromise the options or the quality of life for future generations. 2

3 3. Background 1. Bear Island Bear Island Indian Reserve #1 (Bear Island) was designated as a reserve in 1971 and is a remote community located in the hub of Lake Temagami, Nipissing District, Northeastern Ontario. Bear Island which sits at the geographic centre of Lake Temagami is roughly triangular in shape and contains a Reserve area of 286 hectares more or less. Temagami First Nation is the governing body of the community under the Indian Act (INAC). The estimated total on-reserve population is 203 and the total registered offreserve population is 569. On June 24, 2017, Temagami First Nation Council enacted the Temagami First Nation Land Code which gives Council land law making powers for Bear Island, including but not limited to regulation, control and prohibition of zoning, land use, subdivision control and land development. With the Land Code in place, Temagami First Nation / Teme- Augama Anishnabai are ready to develop a Master Land Use Plan for Bear Island. 2. Lands Set Aside In 1996, the Ontario government set aside lands that were previously selected by Teme- Augama Anishnabai as sole stewardship lands, in addition the lands also included the 1885 Austin Bay Tract. These lands set aside are to provide new economic development opportunities for the Temagami Indigenous community and facilitate settlement of the Teme-Augama Anishnabai (TAA) land claim. Since that time, the Lands Set Aside have not been open to staking under the Mining Act and the Ontario government has made no new development or resource commitments on this land without the consent of. Economic development opportunities on the Lands Set Aside will be subject to recommendations from the. In determining appropriate recommendations for the Lands Set Aside the Ontario government encourages to consider maximizing the economic benefits to the members of their community. The Ontario 3

4 government s representatives for receiving such recommendations are the ministries of Natural Resources and Forestry, and Northern Development and Mines. Any development that ultimately occurs on the Lands Set Aside will be governed by applicable provincial laws, policies and regulations including the lands and resource protections identified in the Provincial Policy Statement, 2014 until such time as the lands are transferred to Temagami First Nation /Teme-Augama Anishnabai. In this Request for Proposals, are looking to develop a Master Land Use Plan for the Lands Set Aside to guide development that will maximize land use economic benefits for their community. 4. Purpose 1. Bear Island The information contained in the Temagami First Nation Final Capital Planning Study, 2011, is a good starting point for the Master Land Use Plan. The purpose of the Master Land Use Plan is to develop policies that will ensure that Bear Island is a healthy and sustainable community. It will be a building block that will instil a feeling of pride on the part of residents in their community which will provide the basis for continued growth and renewal. The Master Land Use Plan for Bear Island will provide policies relating to: a. Development and Land Use patterns b. Demographics c. Housing and growth management d. Recreation e. Infrastructure including sewage, water and storm water f. Transportation including roads, marine facilities g. Waste Management including re-cycling h. Energy supply, Telephone, Internet, Cell service i. Energy conservation, Air Quality and Climate Change j. Natural Heritage and Environment Features k. Cultural Heritage and Archaeology l. Long term economic prosperity m. Resource management 4

5 2. Lands Set Aside The purpose of the Master Land Use Plan for the Lands Set Aside in keep with Temagami First Vision and Principles is to provide land use economic development opportunities for. The Lands Set Aside consist of three tracts of undeveloped Crown land bordering the north and east side of Lake Temagami. will be considering the best end use for the Lands Set Aside. A key component of the planning exercise will be an understanding of what choices has in the future with respect to a mainland settlement area, economic development and land use planning on the Lands Set Aside. The consultant s role is to clearly articulate the principles behind the proposed land use, how the proposed land use is consistent with or conflicts with other policy documents, and identify the choices available to Temagami First Nation /Teme-Augama Anishnabai. The Master Land Use Plan for the Lands Set Aside will consider the following policy documents: a. Provincial Policy Statement, 2014 b. Growth Plan for Northern Ontario 2011 c. Temagami Land Use Plan for the Temagami Comprehensive Planning Area 1997 d. Compatibility with Municipality of Temagami Official Plan 2013 e. Temagami Management Unit Forest Management Plan, 2019 (when available). A significant task will be to inventory the Lands Set Aside to determine what the lands look like in terms of size, topography, natural heritage and environment features, water, forestry resources, mineral and mineral aggregate resources, cultural heritage and archaeology, and natural and human-made hazards. Temagami First Nation has compiled some of this information through their Forest Management Program, and additional information may be acquired from Ontario government databases that Temagami First Nation has available. 5. Master Land Use Planning Team Structure The Director of Lands and Resources for Temagami First Nation will oversee the Master Land Use Plan project. The Lands and Resources Advisory Committee established under the 5

6 Temagami First Nation Land Code will provide guidance with respect to the process, deliverables, and community consultation. The Draft Master Land Use Plan will be reviewed by the Ontario First Nations Technical Services Corporation. The Final Master Land Use Plan will be enacted by Council following completion of the decision making process set out in the Temagami First Nation Land Code. 6. Approach to Community Consultation recognize the vital role of community outreach and consultation and anticipate that this may be the most important component of the Master Land Use Plan project. Consultants when preparing the community consultation segment of their proposal should consider the following: a. It has been some time since that Land Use Planning was introduced to the Temagami First Nation / Teme-Augama Anishnabai community and there is a need to lay a good foundation for the project and transfer of knowledge so that community members can understand the need, future benefits, the land use planning process in general, and more specifically the Master Land Use Plan process for Bear Island and the Lands Set Aside. b. The consultant will work closely with the Land Code Implementation Coordinator who will serve in a community liaison role for the project. It is anticipated that this position will allow for knowledge transfer from the consultant to the community and vice versa, and provide for a more meaningful and culturally rich land use planning process for members. c. The decision making process as outlined in the Temagami First Nation Land Code must be strictly adhered to. d. There is a desire for targeted youth engagement in the land use planning process as the Master Land Use Plan will provide policies that will affect many future generations of members and the youth of the community will be the future leaders. e. Most members of Temagami First Nation reside on Bear Island, in the Municipality of Temagami and in the City of North Bay. All community engagement meetings shall be held consecutively in these three communities in order to allow for the greatest level of community participation and to hear from a representative cross section of members. f. Notices of community engagement meetings shall follow the requirements prescribed in the Temagami First Nation Land Code. 6

7 g. The optimum time to schedule community engagement meetings is during the months of May June, September-October, and mid-january mid-march. h. are looking for innovative, dynamic and interactive community engagement meetings that provide opportunities for the community to be heard and listened to and not managed throughout the process. i. Meeting spaces must be centrally located and easy for community members to get to. Meetings should be held in spaces where where community members feel comfortable and welcome; and must be accessible for elders and persons living with disabilities. Health breaks and healthy food should be made available. j. The consultant is required to lead all community engagement sessions in a culturally sensitive manner and keep accurate records of verbal and written comments made by community members. The consultant should provide a summary of comments received, consider and outline options regarding what effect the comments have on the proposed policies, and suggest a preferred option for the Lands and Resources Advisory Committee s consideration. 7. Time Frame Temagami First Nation/Teme-Augama Anishnabai are anticipating that the Master Land Use Plan project to take place over a period of up to 24 months. Proposals are due on August and a consultant will be selected on or before September The project start date will be October and will need to be completed by October Completion is when the Master Land Use Plan is enacted by Council in accordance with the Temagami First Nation Land Code. 8. Proposal Content The consultant will prepare a proposal which clearly indicates how the consultant will carry out the work set out in this Request for Proposals. The consultant s proposal will contain, but not be limited to: a. Methodology indicating the approach that will be used in the project. b. A detailed proposal for community engagement and stakeholder consultation. c. A schedule of tasks, meetings with the Lands and Resources Advisory Committee, community members and stakeholder groups. d. Names, qualifications and experience of staff and sub-consultants assigned to the project, and identify the project lead. Specifically outline the consultants knowledge, understanding and experience working with First Nation communities. 7

8 e. Examples of past projects of a similar nature successfully completed by the consultant and sub-consultants including references from projects. References from First Nation communities are considered an asset. f. Maximum total cost of the project, broken down by phases and tasks, with fees and disbursement costs listed separately; along with suggested payment schedule related to tasks completed. g. Per diem rates for key personnel involved in the project, with an estimate of the number of days that the project staff will spend on the project. h. Identify any other costs that may be considered necessary for completion of this project including specific costs over and above the quoted price; that may be apportioned to. 9. Deliverables anticipate the following deliverables: a. Background studies, information and maps acquired for the purpose of this project. b. Community engagement notices to be prepared by the consultant in consultation with the Director of Lands and Resources. c. Presentation materials and community engagement records including attendance records, summary of verbal comments, original written comments. d. Background Issues and Options Reports for Bear Island and the Lands Set Aside. e. Draft Master Land Use Plan in PDF format. f. Final Master Land Use Plan in PDF and Word format. 10. Mapping The consultant is required to coordinate mapping for the Master Land Use Plan. Temagami First Nation has mapping capabilities through their Forest Management Program and may choose to undertake the mapping component for the Project in consultation with the Consultant. The proposal submission should provide two prices with respect to mapping: (1) Consultant is solely responsible for all required mapping. (2) Consultant co-ordinates mapping with Temagami First Nation. Mapping shall be compatible with ArcMap 10 and include the.shp,.shx.,.dbf,.prj, and.sbn, files for each shape file. 8

9 11. Proposal Submission Proposal submissions shall be a maximum of 20 pages including all supporting documents. Given the difficulty of delivering proposals by personal service, courier or mail to the remote community of Bear Island, all proposals shall be submitted by only on or before August 10, 2018 at 11:59 pm to: Proposal Submission shall include: Robin Koistinen, Director of Lands and Resources Robin.koistinen@temagamifirstnation.ca a. Proposal in accordance with Section 8 - Proposal Content b. Separate costs for mapping in accordance with Section 10 - Mapping. c. References in accordance with Section13 - References d. Project budget in accordance with Section 8 Proposal Content and Section 14 - Project Budget e. Statement of Acknowledgement of Addenda in accordance with Section 19 - Addenda. f. Declaration of conflict of interest if applicable in accordance with Section 21 - Conflict of Interest. g. Letter requesting non-disclosure of documents if applicable, in accordance with Section 22 - Ownership of Proposals and Disclosure 12. Background Resources Available The following background resources or links to background resources will be posted on Temagami First Nation website under Lands and Resources Department Land Code Section - Master Land Use Plan as follows: a. Temagami First Nation Land Code, 2017 b. Temagami First Nation Capital Planning Study Final Version, 2011 c. Temagami First Nation Community Profile d. Temagami First Nation Lands Set Aside Map e. Temagami First Nation Forestry Strategy,

10 f. Temagami First Nation Memorandum of Understanding (MOU) with Municipality of Temagami, 2003 g. Temagami Management Unit Forest Management Plan, (when available). h. Temagami Land Use Plan for the Temagami Comprehensive Planning Area, 1997 ( i. Municipality of Temagami Official Plan, 2013 (temagami.ca) 13. References The consultant will provide a minimum of three (3) references for consulting services for similar projects since January reserve the right to contact any or all references. define a reference as any reference supplied within a proposal submission, in addition to any others known to the. 14. Project Budget All prices shall be FIRM and in Canadian Dollars for the project and shall include, without limitation, all required labour, materials and other services required to complete the project. are exempt from paying HST therefore all prices should be without HST. 15. Incurred Costs All costs incurred by the consultant in carrying out research, investigation or otherwise as may be necessary for the preparation of a response to this Request for Proposals shall be borne by the consultant and will not be chargeable in any way to Temagami First Nation / Teme-Augama Anishnabai. reserve the right to change the scope of this project to bring the price within approved budget limits. Temagami First Nation / Teme- Augama Anishnabai reserve the right to waive formalities and enter into negotiations with the successful consultant, all consultants, or any consultant to bring the project to within budget available. Should it be deemed that the changes in the scope of the project are of sufficient magnitude may cancel the Request for Proposals and at its sole discretion may commence a new process in order to complete the project within the budget available. 10

11 Temagami First Nation /Teme-Augama Anishnabai shall not be responsible for any liabilities, costs, expenses, loss or damage incurred, sustained or suffered by any consultant(s) prior to or subsequent to or by reason of the acceptance or non-acceptance or delay related to this proposal. 16. Errors and Omissions shall not be held liable for any errors or omissions in any part of this Request for Proposals. The information in this Request for Proposals has been provided solely as a guideline for consultants. The information is not guaranteed or warranted to be accurate by nor is it necessarily comprehensive or exhaustive. Consultants are to form their own opinions and conclusions with respect to the matters addressed in the Request for Proposals. 17. Evaluation The following selection criteria outline the areas of importance that will be considered in project award. Proposal submissions should satisfy all criteria points wherever possible. Temagami First Nation Lands and Resources Advisory Committee, staff, and advisors will review all qualified proposals received and score the proposals using a consensus approach in relation to the following criteria: a. Project understanding, methodology and work plan 15% b. Community engagement strategies 25% c. Firm s and Project Team s (dedicated to the project) qualifications and experience on similar projects 15% d. Project schedule 15% e. Project Price 25% f. Quality of submission 5% will accept the proposal that is deemed to be the best value to, and reserve the right to accept other than the lowest priced proposal. All qualified proposals will be reviewed and evaluated. Additional information may be requested from one, more than one, or all consultants if required for evaluation of the proposals. 11

12 18. Communications Inquiries regarding the interpretation or scope of the Request for Proposals shall be submitted by only, prior to July , to: Robin Koistinen, Director of Lands and Resources All inquiries must reference: Master Land Use Plan RFP in the subject line. In submitting a proposal, the consultant acknowledges that they have read, understood, and accepted the terms and conditions of the Request for Proposals in full. Temagami First Nation / Teme-Augama Anishnabai are not responsible for any misunderstanding of the Request for Proposals. Under no circumstances shall the consultant rely upon any information or instruction from, its employees or agents unless in writing by the Director of Lands and Resources. 19. Addenda Consultants will be advised by addenda of any required additions, deletions, or alterations in the requirements of the Request for Proposals. Addenda will be posted on the Temagami First Nation Website at: under the Request for Proposals - Master Land Use Plan. It is the consultant s sole responsibility to check for addenda issued. Acknowledgement of Addenda is a mandatory requirement. Failure to acknowledge addenda will result in the Proposal being deemed non-compliant and not eligible for award. 20. Right to reject or not open reserve the right to reject any or all proposals, and the lowest or highest as the case may be will not necessarily be accepted. The right is reserved to accept the whole or any part of the proposal. Temagami First Nation / Teme-Augama Anishnabai reserve the right to NOT open a proposal should an inadequate number of proposals be received. Unopened bids shall be returned to all consultants who responded. 12

13 21. Conflict of Interest reserve the right to disqualify a proposal where they believe a conflict of interest or potential conflict of interest exists in regard to the consultant and the project. The successful consultant will work solely and exclusively in the interests of Temagami First Nation / Teme-Augama Anishnabai at all times to ensure that the project is successfully completed. The consultant must identify current and potential situations of conflict of interest or perceived conflict of interest that they may have in the service area if any. This information will be considered by the in their evaluation of the proposal. 22. Ownership of Proposals and Disclosure All documents, including proposals, submitted to Temagami First Nation / Teme-Augama Anishnabai will become the property of. If the consultant wishes any or all of the documents that they submit to the Temagami First Nation / Teme-Augama Anishnabai as part of this proposal to be protected from disclosure to third parties, the consultant must provide a signed letter enclosed with their proposal outlining the parts of the proposal to be protected. This letter will not guarantee that there will never be disclosure, but it does lay the groundwork for handling an application for disclosure by a third party. 23. Health and Safety and WSIB The successful consultant is required to conform to the Occupational Health and Safety Act related to performance of the contract. In addition, the successful consultant will be required to provide to a valid Clearance Certificate issued by Workplace Safety and Insurance Board (WSIB). 24. Insurance While the consultant will be responsible for maintaining adequate insurance to cover all claims, including but not limited to professional errors and omissions, liability and automobiles, such policy shall also name thereunder. Upon 13

14 successful award of the proposal the consultant will be required to supply Temagami First Nation / Teme-Augama Anishnabai with certificates of insurance as per above. The consultant must maintain coverage stated above throughout the contract period. 25. Indemnification The successful consultant shall indemnify and save harmless Temagami First Nation / Teme- Augama Anishnabai and their employees from all actions, suits, claims and demands whatsoever which may arise directly or indirectly by reason of a requirement of the contract, save and except for damage caused by the negligence of the Temagami First Nation / Teme- Augama Anishnabai or their employees. End of Request for Proposals 14

Casque Isles Hiking Trail Upgrade Project

Casque Isles Hiking Trail Upgrade Project Casque Isles Hiking Trail Upgrade Project Request for Proposals Release Date: May 1st, 2016 Deadline for Questions: Closing: June 3 rd, 2016 @ 2:00pm June 9 th, 2016 @ 2:00pm Please include this cover

More information

Request for Proposals

Request for Proposals E CONOMIC DEVELOPMENT AUTHORITY of the City of Norfolk Board of Directors Officers Robert E. Garris, Jr., Chairman Executive Director Michael W. Lee, Vice Chairman Peter Chapman Jeffrey F. Brooke Kim Brown

More information

SERVICE AGREEMENT. The Parties agree as follows: 1. SERVICE AGREEMENT:

SERVICE AGREEMENT. The Parties agree as follows: 1. SERVICE AGREEMENT: SERVICE AGREEMENT This Service Agreement (the Service Agreement ) is effective as of the date of purchase of the baggage tracking service product offered by Blue Ribbon Bags, LLC ( Provider ) by, or on

More information

MATERIALS AND PROCUREMENT DEPARTMENT 1900 YONGE STREET PAGE 1 OF 1 TORONTO, ONTARIO M4S 1Z2

MATERIALS AND PROCUREMENT DEPARTMENT 1900 YONGE STREET PAGE 1 OF 1 TORONTO, ONTARIO M4S 1Z2 TORONTO TRANSIT COMMISSION ADDENDUM NO._1 MATERIALS AND PROCUREMENT DEPARTMENT 1900 YONGE STREET PAGE 1 OF 1 TORONTO, ONTARIO M4S 1Z TITLE: PRINTING AND SUPPLY OF RIDE GUIDES FOR UP TO A THREE () YEAR

More information

Request for Proposal (RFP) Fixed Wing Aircraft Transportation Services. For Matawa First Nations

Request for Proposal (RFP) Fixed Wing Aircraft Transportation Services. For Matawa First Nations Request for Proposal (RFP) Fixed Wing Aircraft Transportation Services For Matawa First Nations TABLE OF CONTENTS SECTION I INTRODUCTION 3 SECTION II PROPOSED SCHEDULE 4 SECTION III BACKGROUND 5 SECTION

More information

City of Lafayette. Request for Proposals Municipal Airport Fixed Based Operator

City of Lafayette. Request for Proposals Municipal Airport Fixed Based Operator City of Lafayette Request for Proposals Municipal Airport Fixed Based Operator NOTICE PROPOSERS The City of Lafayette is seeking an experienced, reliable professional to establish and operate a fullservice

More information

Town of Canandaigua 5440 Routes 5 & 20 West Canandaigua, NY (585) Established 1789

Town of Canandaigua 5440 Routes 5 & 20 West Canandaigua, NY (585) Established 1789 Town of Canandaigua 5440 Routes 5 & 20 West Canandaigua, NY 14424 (585) 394-1120 www.townofcanandaigua.org Established 1789 In an effort to ensure the most efficient use of taxpayer resources, the Town

More information

PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES

PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES The Canadian Airport Authority ( CAA ) shall be incorporated in a manner consistent with the following principles: 1. Not-for-profit Corporation

More information

Policy PL Date Issued February 10, 2014

Policy PL Date Issued February 10, 2014 Subject RENEWABLE ENERGY ON CROWN LAND Compiled by Renewable Energy Program, Biodiversity Branch Replaces Policy Directives Waterpower Site Release Crown Land Onshore Windpower Development - Crown Land

More information

Asia Pacific Regional Aviation Safety Team

Asia Pacific Regional Aviation Safety Team International Civil Aviation Organization (ICAO) Regional Aviation Safety Group (Asia & Pacific Regions) Asia Pacific Regional Aviation Safety Team GUIDANCE FOR AIR OPERATORS IN ESTABLISHING A FLIGHT SAFETY

More information

A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION

A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION Manitoba Wildands December 2008 Discussions about the establishment of protected lands need to be clear about the definition of protection. We will

More information

VoIP RADIO CONSOLE SYSTEM FOR MACON COUNTY EMERGENCY MANAGEMENT

VoIP RADIO CONSOLE SYSTEM FOR MACON COUNTY EMERGENCY MANAGEMENT REQUEST FOR BIDS AND PROPOSALS BID REQUEST NO. 4375-02 VoIP RADIO CONSOLE SYSTEM FOR MACON COUNTY EMERGENCY MANAGEMENT ISSUE DATE: December 23, 2011 BID OPENING DATE: JANUARY 11, 2012 3:00 PM LOCAL TIME

More information

Official Rules and Regulations of Tourism Tofino and Tourism Ucluelet s Surf Season Giveaway Contest

Official Rules and Regulations of Tourism Tofino and Tourism Ucluelet s Surf Season Giveaway Contest Official Rules and Regulations of Tourism Tofino and Tourism Ucluelet s Surf Season Giveaway Contest NO PURCHASE OR PAYMENT OF ANY KIND IS NECESSARY TO ENTER OR WIN. Eligibility: Tourism Tofino and Tourism

More information

TOWN OF OSOYOOS DIVIDEND RIDGE AND SPARTAN DRIVE/FUJI COURT STREET LIGHT INSTALLATION

TOWN OF OSOYOOS DIVIDEND RIDGE AND SPARTAN DRIVE/FUJI COURT STREET LIGHT INSTALLATION TOWN OF OSOYOOS DIVIDEND RIDGE AND SPARTAN DRIVE/FUJI COURT STREET LIGHT INSTALLATION CONTRACT DOCUMENTS AND SPECIFICATIONS TRUE Consulting September 2012 Job No. 302-1322 PLANHOLDER REGISTRATION FORM

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

Decision (Applicant claims urgent public need )

Decision (Applicant claims urgent public need ) Decision (Applicant claims urgent public need ) Page 1 Application: Applicant: Address: 93-09 UPN Royal City Taxi Ltd. 436 Rousseau St, New Westminster BC V3L 3R3 Principals: GHUMAN, Parambir DHLLON, Chamkaur

More information

Training and licensing of flight information service officers

Training and licensing of flight information service officers 1 (12) Issued: 16 August 2013 Enters into force: 1 September 2013 Validity: Indefinitely Legal basis: This Aviation Regulation has been issued by virtue of Section 45, 46, 119 and 120 of the Aviation Act

More information

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET Form 1221-2 (June 1969) UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET Release 8-83 Date Subject 8353 Trail Management Areas Secretarially Designated (Public)

More information

Strengthening the Ontario Trails Strategy. Report on Consultations and the Environmental Bill of Rights Registry

Strengthening the Ontario Trails Strategy. Report on Consultations and the Environmental Bill of Rights Registry Strengthening the Ontario Trails Strategy Report on Consultations and the Environmental Bill of Rights Registry Purpose To report on the feedback and information received through the regional consultations,

More information

Lansing Municipal Airport 3250 Bob Malkas Dr., Lansing, Illinois (708) phone (708) fax

Lansing Municipal Airport 3250 Bob Malkas Dr., Lansing, Illinois (708) phone (708) fax Lansing Municipal Airport 3250 Bob Malkas Dr., Lansing, Illinois 60438 (708) 418-5888 phone (708) 418-3862 fax REQUEST FOR PROPOSALS FOR AERONAUTICAL SERVICES and or AVIATION ORIENTED COMMERCIAL ACTIVITIES

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

ALASKA AIRLINES AND VIRGIN AMERICA AVIATION SAFETY ACTION PROGRAM (ASAP) FOR FLIGHT ATTENDANTS MEMORANDUM OF UNDERSTANDING

ALASKA AIRLINES AND VIRGIN AMERICA AVIATION SAFETY ACTION PROGRAM (ASAP) FOR FLIGHT ATTENDANTS MEMORANDUM OF UNDERSTANDING ALASKA AIRLINES AND VIRGIN AMERICA AVIATION SAFETY ACTION PROGRAM (ASAP) FOR FLIGHT ATTENDANTS MEMORANDUM OF UNDERSTANDING 1. GENERAL. Alaska Airlines and Virgin America (AS/VX) are Title 14 of the Code

More information

Port of Friday Harbor

Port of Friday Harbor REQUEST FOR STATEMENTS OF QUALIFICATIONS (RFQ) TO PROVIDE ENGINEERING / CONSULTANT SERVICES AT FRIDAY HARBOR AIRPORT Dated: February 15, 2018 Pursuant to RCW, Chapter 39.80 and FAA AC 150/5100-14E, the

More information

AGREEMENT FOR OPERATION OF THE AIR TRAFFIC CONTROL TOWER AT THE TRUCKEE TAHOE AIRPORT

AGREEMENT FOR OPERATION OF THE AIR TRAFFIC CONTROL TOWER AT THE TRUCKEE TAHOE AIRPORT AGREEMENT FOR OPERATION OF THE AIR TRAFFIC CONTROL TOWER AT THE TRUCKEE TAHOE AIRPORT This AGREEMENT FOR OPERATION OF THE AIR TRAFFIC CONTROL TOWER SERVICES AT TRUCKEE TAHOE AIRPORT ( Agreement ) is made

More information

INVITATION FOR EXPRESSION OF INTEREST

INVITATION FOR EXPRESSION OF INTEREST 1. Introduction INVITATION FOR EXPRESSION OF INTEREST Indah Water Konsortium Sdn Bhd (Company No. 211763-P) ( IWK ) is seeking for Expression of Interest (EOI) from consultants registered with the Ministry

More information

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY ICAO UNIVERSAL SAFETY OVERSIGHT AUDIT PROGRAMME (USOAP) Continuous Monitoring Approach (CMA) FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY (16 to 20 November

More information

Request for Information No OHIO/INDIANA UAS CENTER AND TEST COMPLEX. COA and Range Management Web Application. WebUAS

Request for Information No OHIO/INDIANA UAS CENTER AND TEST COMPLEX. COA and Range Management Web Application. WebUAS OHIO/INDIANA UAS CENTER AND TEST COMPLEX COA and Range Management Web Application WebUAS Request for Information (RFI) Issuing Agency: Ohio Department of Transportation Issue Date: 12/10/2013 Respond by:

More information

SUPPLEMENTAL NOTE ON HOUSE SUBSTITUTE FOR SENATE BILL NO. 70

SUPPLEMENTAL NOTE ON HOUSE SUBSTITUTE FOR SENATE BILL NO. 70 SESSION OF 2017 SUPPLEMENTAL NOTE ON HOUSE SUBSTITUTE FOR SENATE BILL NO. 70 As Recommended by House Committee on Federal and State Affairs Brief* House Sub. for SB 70 would enact law and amend the Kansas

More information

REQUEST FOR PROPOSAL 2017 ATIA CONVENTION & TRADE SHOW

REQUEST FOR PROPOSAL 2017 ATIA CONVENTION & TRADE SHOW REQUEST FOR PROPOSAL 2017 ATIA CONVENTION & TRADE SHOW COMPANY BACKGROUND The dynamic changes at the Alaska Travel Industry Association (ATIA) over the past few years have brought a new life to the association

More information

United States USCIS Final Rule Contains Significant Changes for AC21 Provisions

United States USCIS Final Rule Contains Significant Changes for AC21 Provisions United States USCIS Final Rule Contains Significant Changes for AC21 Provisions At the end of 2016, the United States Citizenship and Immigration Services ( USCIS ) issued a final rule 1 that affects several

More information

Human Powered Flight THE KREMER HUMAN-POWERED AIRCRAFT FOR SPORT

Human Powered Flight THE KREMER HUMAN-POWERED AIRCRAFT FOR SPORT Human Powered Flight Rules and Regulations for THE KREMER HUMAN-POWERED AIRCRAFT FOR SPORT THE ROYAL AERONAUTICAL SOCIETY 4 Hamilton Place, London, W1V OBQ Telephone +44 (0)20 7670 4345 Fax +44 (0)20 7670

More information

Program Manual. January 1, EarthCraft House Single Family Program. Viridiant 1431 West Main Street Richmond, VA

Program Manual. January 1, EarthCraft House Single Family Program. Viridiant 1431 West Main Street Richmond, VA Program Manual EarthCraft House Single Family Program January 1, 2017 Viridiant 1431 West Main Street Richmond, VA 23220 804.225.9843 EarthCraft House Project Process Process Overview All EarthCraft Builders

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

Advisory Circular. Canada and United States Bilateral Aviation Safety Agreement Maintenance Implementation Procedures

Advisory Circular. Canada and United States Bilateral Aviation Safety Agreement Maintenance Implementation Procedures Advisory Circular Subject: Issuing Office: Canada and United States Bilateral Aviation Safety Agreement Maintenance Implementation Procedures Aircraft Maintenance and Manufacturing Activity Area: Rulemaking

More information

3.1. Unless otherwise agreed between INFLITE and the Charterer and specified in the Charter Booking Confirmation, normal terms of payment will be:

3.1. Unless otherwise agreed between INFLITE and the Charterer and specified in the Charter Booking Confirmation, normal terms of payment will be: INFLITE Charters Limited & INFLITE Ski Planes Ltd Terms and Conditions Domestic Aircraft Charter & Aviation Tourism The following terms and conditions (the Conditions ) shall apply to all chartering of

More information

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION. Title: Certification of Air Navigation Services Providers

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION. Title: Certification of Air Navigation Services Providers Page 1 of 6 1.0 PURPOSE 1.1. This order provides direction and guidance to the Inspectors in the process of certification of ANSPs as required by the Civil Aviation (Air Navigation Services) Regulations.

More information

Welcome. Sustainable Eco-Tourism in the face of Climate Change. Presented by Jatan Marma

Welcome. Sustainable Eco-Tourism in the face of Climate Change. Presented by Jatan Marma Welcome Sustainable Eco-Tourism in the face of Climate Change Presented by Jatan Marma Definition Sustainable Development: is a process to meet the needs of the present without compromising the ability

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

Policy Memorandum. Authority 8 CFR governs USCIS adjudication of Form I-601.

Policy Memorandum. Authority 8 CFR governs USCIS adjudication of Form I-601. U. S. Citizenship and Immigration Services Office of the Director (MS 2000) Washington, DC 20529-2000 May 9, 2011 PM-602-0038 Policy Memorandum SUBJECT: Requests to Expedite Adjudication of Form I-601,

More information

RFP BROADBAND MODERNIZATION PROJECT REQUEST FOR PROPOSAL

RFP BROADBAND MODERNIZATION PROJECT REQUEST FOR PROPOSAL RFP 408 - BROADBAND MODERNIZATION PROJECT REQUEST FOR PROPOSAL Issue Date: December 8th, 2017 Jennifer Frederickson and Todd Springer, Buyers Issued by: The Thames Valley District School Board Return Date:

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

Safety Regulatory Oversight of Commercial Operations Conducted Offshore Page 1 of 15 Safety Regulatory Oversight of Commercial Operations Conducted Offshore 1. Purpose and Scope 2. Authority... 2 3. References... 2 4. Records... 2 5. Policy... 2 5.3 What are the regulatory

More information

USCIS seeks your input on the interim policy memos listed below.

USCIS seeks your input on the interim policy memos listed below. USCIS - Interim Memoranda for Comment http://www.uscis.gov/portal/site/uscis/template.print/menuitem.eb1d4c... 1 of 2 2/14/2011 9:06 AM USCIS seeks your input on the interim policy memos listed below.

More information

5-9 April 2018 Palacio de Congresos, Ferias y Exposiciones Marbella, Spain. Application 2018 EXHIBITORS.

5-9 April 2018 Palacio de Congresos, Ferias y Exposiciones Marbella, Spain. Application 2018 EXHIBITORS. 5-9 April 2018 Palacio de Congresos, Ferias y Exposiciones Marbella, Spain Application 2018 EXHIBITORS www.marbelladesignfair.com REQUIRED INFORMATION (Please print or type) Exhibitor Name (as it will

More information

TERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office

TERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office TERMS OF REFERENCE Drone Advisory Committee (DAC) Committee Leadership Role Name or Title Organization Chairman Lead Designated Federal Officer Subcommittee Oversight Oversight Brian Krzanich Administrator

More information

2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE

2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE 2.1 Item: VMC Sub-committee Report DATE: Tuesday, June 12, 2018 WARD: 4 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE FROM: Jason Schmidt-Shoukri, Deputy City Manager, Planning

More information

Terms and Conditions of the Carrier

Terms and Conditions of the Carrier Terms and Conditions of the Carrier Article 1 - Definitions The below Conditions of Carriage has the meaning expressed respectively assigned to them where the Carrier reserves the rights to maintain and

More information

Aeronautical Prices and Terms and Conditions

Aeronautical Prices and Terms and Conditions Aeronautical Prices and Terms and Conditions 1 July 2017 Terms and Conditions Christchurch International Airport Limited ( CIAL ) is registered as a limited liability company under the Companies Act in

More information

Ministry of Parks, Culture and Sport. Plan for saskatchewan.ca

Ministry of Parks, Culture and Sport. Plan for saskatchewan.ca Ministry of Parks, Culture and Sport Plan for 2018-19 saskatchewan.ca Table of Contents Statement from the Minister... 1 Response to Government Direction... 2 Operational Plan... 3 Highlights... 7 Financial

More information

REGISTRAR OF PASSENGER TRANSPORTATION MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE

REGISTRAR OF PASSENGER TRANSPORTATION MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE REGISTRAR OF PASSENGER TRANSPORTATION MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE TEMPORARY OPERATING PERMIT Extra-provincial Undertaking (originating outside of British Columbia) APPLICATION PACKAGE

More information

ILTM Buyer Terms and Conditions

ILTM Buyer Terms and Conditions ILTM Buyer Terms and Conditions DEFINITIONS ILTM or Exhibition means the International Luxury Travel Market to be held at Cannes, France from 04 th to 07 th December 2017 which is owned and organised by

More information

Shuttle Membership Agreement

Shuttle Membership Agreement Shuttle Membership Agreement Trend Aviation, LLC. FlyTrendAviation.com Membership with Trend Aviation, LLC. ("Trend Aviation") is subject to the terms and conditions contained in this Membership Agreement,

More information

CITY OF NEWPORT AND PORT OF ASTORIA REQUEST FOR PROPOSALS -- SCHEDULED AIRLINE SERVICE BASIC INFORMATION

CITY OF NEWPORT AND PORT OF ASTORIA REQUEST FOR PROPOSALS -- SCHEDULED AIRLINE SERVICE BASIC INFORMATION CITY OF NEWPORT AND PORT OF ASTORIA -- BASIC INFORMATION DEADLINE FOR SUBMISSION: October 15, 2008 -- 5:00 pm SUBMIT PROPOSALS TO: Gary Firestone City Attorney City of Newport 169 SW Coast Highway Newport,

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

TRANSPORT CANADA PROFESSIONAL AVIATION CURRENCY PROGRAM Effective: 1 April 2007

TRANSPORT CANADA PROFESSIONAL AVIATION CURRENCY PROGRAM Effective: 1 April 2007 TRANSPORT CANADA PROFESSIONAL AVIATION CURRENCY PROGRAM Effective: 1 April 2007 PREAMBLE Civil Aviation Inspector and Engineering Test Pilot employees shall be provided with the opportunity to maintain

More information

FILE: /PERM EFFECTIVE DATE: May 16, 2014 AMENDMENT:

FILE: /PERM EFFECTIVE DATE: May 16, 2014 AMENDMENT: APPROVED AMENDMENTS: Effective Date Briefing Note /Approval Summary of Changes: FILE: 11000-00/PERM EFFECTIVE DATE: May 16, 2014 AMENDMENT: Table of Contents 1. POLICY APPLICATION... 1 2. PRINCIPLES AND

More information

CODE OF CONDUCT. Corporate Compliance 10.9 Effective: 12/17/13 Reviewed: 1/04/17 Revised: 1/04/17

CODE OF CONDUCT. Corporate Compliance 10.9 Effective: 12/17/13 Reviewed: 1/04/17 Revised: 1/04/17 Corporate Compliance 10.9 Effective: 12/17/13 Reviewed: 1/04/17 Revised: 1/04/17 1. POLICY This policy defines the commitment that PHI Air Medical, L.L.C has to conducting our activities in full compliance

More information

Policy Memorandum. Authority 8 CFR governs USCIS adjudication of Form I-601.

Policy Memorandum. Authority 8 CFR governs USCIS adjudication of Form I-601. U. S. Citizenship and Immigration Services Office of the Director (MS 2000) Washington, DC 20529-2000 June 6, 2012 PM-602-0038.1 Policy Memorandum SUBJECT: Requests to Expedite Adjudication of Form I-601,

More information

For personal use only

For personal use only ASX / Media Announcement 10 November 2017 Artemis Resources Limited ARBN: 80 107 051 749 Level 3, IBM Building, 1060 Hay Street, West Perth, WA Australia, 6006 PO Box R933 Royal Exchange NSW Australia,

More information

REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT

REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT March 13, 2012 LINCOLN COUNTY BOARD OF COMMISSIONERS 104 N. MAIN, STE. 110 CANTON, SD 57013-1703 (605)764-5732

More information

Application for Membership

Application for Membership Personal Information Application for Membership First Name Street Last Name City Home Phone Cell Phone Flying Goals State Work Phone Email Zip x Pilot Information Date of Birth Last Medical Last Flight

More information

1.0 BACKGROUND NEW VETERANS CHARTER EVALUATION OBJECTIVES STUDY APPROACH EVALUATION LIMITATIONS... 7

1.0 BACKGROUND NEW VETERANS CHARTER EVALUATION OBJECTIVES STUDY APPROACH EVALUATION LIMITATIONS... 7 New Veterans Charter Evaluation Plan TABLE CONTENTS Page 1.0 BACKGROUND... 1 2.0 NEW VETERANS CHARTER EVALUATION OBJECTIVES... 2 3.0 STUDY APPROACH... 3 4.0 EVALUATION LIMITATIONS... 7 5.0 FUTURE PROJECTS...

More information

Check-in to China Program 2016 Terms & Conditions

Check-in to China Program 2016 Terms & Conditions Check-in to China Program 2016 Terms & Conditions THE TERMS AND CONDITIONS BELOW CONSTITUTE A LEGALLY BINDING AGREEMENT BETWEEN YOU AND DESTINATION MELBOURNE LIMITED WHEN IT FACILITATES THE MAKING OF BOOKINGS

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

CONVENTION AND EXPO CENTER HOTEL BRANDING/MANAGEMENT OPPORTUNITY

CONVENTION AND EXPO CENTER HOTEL BRANDING/MANAGEMENT OPPORTUNITY CONVENTION AND EXPO CENTER HOTEL BRANDING/MANAGEMENT OPPORTUNITY Jones Lang LaSalle s Hotel & Hospitality Group ( JLL ), as sole and exclusive agent for Corporación de Ferias y Exposiciones S.A. ( Corferias

More information

Credit No IN. National Project Director 9,Institutional Area, Lodhi Road, New Delhi Tel:

Credit No IN. National Project Director 9,Institutional Area, Lodhi Road, New Delhi Tel: Sub:Selection of Consultants for preparation of eco-tourism management plan forvedaranyam area in Tamil Nadu. ICZMP (Integrated Coastal Zone Management Project) Credit No. 4765 0 IN Amendment #1 The TOR

More information

CONSOLIDATED GROUP (NON-MEC GROUP) TSA USER AGREEMENT. Dated PERSON SPECIFIED IN THE ORDER FORM (OVERLEAF)

CONSOLIDATED GROUP (NON-MEC GROUP) TSA USER AGREEMENT. Dated PERSON SPECIFIED IN THE ORDER FORM (OVERLEAF) CONSOLIDATED GROUP (NON-MEC GROUP) TSA USER AGREEMENT Dated CORNWALL STODART LAWYERS PERSON SPECIFIED IN THE ORDER FORM (OVERLEAF) CORNWALL STODART Level 10 114 William Street DX 636 MELBOURNE VIC 3000

More information

School Group Permits for Kananaskis Country Parks and Protected Areas-Memo

School Group Permits for Kananaskis Country Parks and Protected Areas-Memo Parks and Protected Areas School Group Permits for Parks and Protected Areas-Memo From: Date: January 4, 2005 Alberta Parks and Protected Areas Telephone: (403) 678-5508 To: All Alberta School Boards and

More information

NATS Swanwick. Interface Agreement. Owners: General Manager LTC Swanwick. General Manager xxxxx Airport

NATS Swanwick. Interface Agreement. Owners: General Manager LTC Swanwick. General Manager xxxxx Airport - 1 - NATS Swanwick Interface Agreement between TERMINAL CONTROL (LTC), SWANWICK And NATS xxxxxx AIRPORT Owners: General Manager LTC Swanwick General Manager xxxxx Airport APPROVED BY Title Name Signature

More information

PROUDLY BRINGING YOU CANADA AT ITS BEST. Management Planning Program NEWSLETTER #1 OCTOBER, 2000

PROUDLY BRINGING YOU CANADA AT ITS BEST. Management Planning Program NEWSLETTER #1 OCTOBER, 2000 PROUDLY BRINGING YOU CANADA AT ITS BEST VUNTUT NATIONAL PARK Management Planning Program NEWSLETTER #1 OCTOBER, 2000 INTRODUCTION This newsletter launches the development of the first management plan for

More information

Amerisearch Background Alliance Privacy Policy

Amerisearch Background Alliance Privacy Policy Amerisearch Background Alliance Privacy Policy Amerisearch Background Alliance hereafter known as Amerisearch respects individual privacy and values the confidence of its customers, employees, consumers,

More information

Steps in the Management Planning Process

Steps in the Management Planning Process Steps in the Management Planning Process Developing a management plan for Kalamalka Lake Park will follow a multi-stage process. The planning process for this park is currently in the Draft Management

More information

HCSS Travel Guidelines

HCSS Travel Guidelines Version 5 HCSS Travel Guidelines 29 February 2016 1. Introduction This guide is the key reference document for all travel payable by ACC relating to the Home and Community Support Service (HCSS) contract.

More information

TURTLE SURVIVAL ALLIANCE EXECUTIVE DIRECTOR

TURTLE SURVIVAL ALLIANCE EXECUTIVE DIRECTOR Transforming passion for turtles into effective conservation action through a global network of living collections and recovery programs. TURTLE SURVIVAL ALLIANCE BACKGROUND TURTLE SURVIVAL ALLIANCE EXECUTIVE

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

Conexus is committed to innovation and bringing financial services to market with speed. We have a long history of innovation, including:

Conexus is committed to innovation and bringing financial services to market with speed. We have a long history of innovation, including: Corporate Profile Saskatchewan's largest and Canada's sixth largest credit union, Conexus has been serving its members for over 80 years. Today we manage more than $7.14 billion in funds and our 900 plus

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

SUSTAINING OUR ENVIRONMENT, PLANNING FOR OUR FUTURE

SUSTAINING OUR ENVIRONMENT, PLANNING FOR OUR FUTURE SUSTAINING OUR ENVIRONMENT, PLANNING FOR OUR FUTURE Key Recommendations to Inform the 2015 Provincial Review of the Oak Ridges Moraine Conservation Plan APRIL 2015 KEY RECOMMENDATIONS TO INFORM THE 2015

More information

SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012

SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012 SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012 TO BE READ IN CONJUNCTION WITH THE CPA MODEL CONDITIONS FOR THE HIRING OF PLANT (2011) EXPLANATORY NOTE: The purpose of these Supplementary Conditions

More information

REQUEST FOR PROPOSALS #1 FOR LEASE OF REAL PROPERTY KNOWN AS CANAL STREET MILL 10 CANAL STREET, VILLAGE OF PHILMONT, NEW YORK

REQUEST FOR PROPOSALS #1 FOR LEASE OF REAL PROPERTY KNOWN AS CANAL STREET MILL 10 CANAL STREET, VILLAGE OF PHILMONT, NEW YORK REQUEST FOR PROPOSALS CANAL STREET MILL VILLAGE OF PHILMONT, NY RFP RELEASE DATE: MARCH 11, 2019 SITE TOUR DATE: MARCH 22, 2019 DEADLINE TO MARCH 25, 2019 SUBMIT QUESTIONS: By 12 noon EST DEADLINE TO APRIL

More information

Bankwest Qantas Rewards Program for the Bankwest Qantas Transaction Account

Bankwest Qantas Rewards Program for the Bankwest Qantas Transaction Account Page 1 bankwest.com.au Bankwest Qantas Rewards Program for the Bankwest Qantas Transaction Account Terms and Conditions 4 April 2017 This booklet covers the terms and conditions that apply to the Bankwest

More information

Samsung Electronics Australia Qantas Frequent Flyer Loyalty Program Rewards Scheme. Terms and Conditions. Effective: 22 March 2018

Samsung Electronics Australia Qantas Frequent Flyer Loyalty Program Rewards Scheme. Terms and Conditions. Effective: 22 March 2018 Samsung Electronics Australia Qantas Frequent Flyer Loyalty Program Rewards Scheme Terms and Conditions Effective: 22 March 2018 1. Introduction 1.1 This Samsung Electronics Australia Qantas Frequent Flyer

More information

CITY CLERK. Toronto-Rochester Fast Ferry - Project Update (Ward 30 Toronto-Danforth)

CITY CLERK. Toronto-Rochester Fast Ferry - Project Update (Ward 30 Toronto-Danforth) CITY CLERK Clause embodied in Report No. 5 of the, as adopted by the Council of the City of Toronto at its meeting held on May 30, 31 and June 1, 2001. 3 Toronto-Rochester Fast Ferry - Project Update (Ward

More information

Advisory Circular. Aircraft Certification Authority Based on Foreign Qualifications

Advisory Circular. Aircraft Certification Authority Based on Foreign Qualifications Advisory Circular Subject: Aircraft Certification Authority Based on Foreign Qualifications Issuing Office: Civil Aviation, Standards Document No.: AC 573-002 File Classification No.: Z 5000-34 Issue No.:

More information

General Authority of Civil Aviation (GACA) Customer Protection Rights Regulation

General Authority of Civil Aviation (GACA) Customer Protection Rights Regulation General Authority of Civil Aviation (GACA) Customer Protection Rights Regulation Issued by the Board of Directors of the General Authority of Civil Aviation Resolution No. (20/380) dated 26/5/1438 H (corresponding

More information

REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT

REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT March 26, 2019 LINCOLN COUNTY BOARD OF COMMISSIONERS 104 N. MAIN, STE. 110 CANTON, SD 57013-1703 (605)764-5732

More information

We may retain and use the personal information that you transmit to us relating to yourself and members of your party for the purposes of:

We may retain and use the personal information that you transmit to us relating to yourself and members of your party for the purposes of: 1. The Carriage of passengers and their baggage is subject to any special conditions and regulations of the Carrier displayed for inspection at latter s booking offices, website and any other medium in

More information

Privacy. Newcrest means Newcrest Mining Limited (ACN ) and each of its subsidiaries; and

Privacy. Newcrest means Newcrest Mining Limited (ACN ) and each of its subsidiaries; and Newcrest respects people's privacy. Newcrest is bound by the Australian Principles in the Act 1988 (Cth) (the Act), as well as other applicable laws protecting privacy. All personal information that Newcrest

More information

AERONAUTICAL INFORMATION CIRCULAR Belgium and Luxembourg

AERONAUTICAL INFORMATION CIRCULAR Belgium and Luxembourg AERONAUTICAL INFORMATION CIRCULAR AIM Belgium Control Tower Tervuursesteenweg 303 1830 Steenokkerzeel BELGIUM FAX: +32 (0) 2 206 24 19 AFS: EBVAYOYX Email: aip.production@belgocontrol.be URL: www.belgocontrol.be

More information

Committee. Presentation Outline

Committee. Presentation Outline CW-33-15 11/9/2015 Community and Corporate Services Committee November 10, 2015 1 Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization

More information

INTERNATIONAL INSTITUTE FOR DEMOCRACY AND ELECTORAL ASSISTANCE

INTERNATIONAL INSTITUTE FOR DEMOCRACY AND ELECTORAL ASSISTANCE INTERNATIONAL INSTITUTE FOR DEMOCRACY AND ELECTORAL ASSISTANCE TERMS OF REFERENCE 1. Background The International Institute of Democracy IDEA seeks proposals from qualified firms to provide consolidated

More information

CUB ADVENTURE CAMP USE REQUEST Heart of Virginia Council, Boy Scouts of America For Non-Profit Groups or Events

CUB ADVENTURE CAMP USE REQUEST Heart of Virginia Council, Boy Scouts of America For Non-Profit Groups or Events Heart of Virginia Scout Reservation Camp T. Brady Saunders, Cub Adventure Camp and Camp S. Douglas Fleet 1723 Maidens Rd., Maidens, VA 23102 Mailing Address PO Box 6809 CUB ADVENTURE CAMP USE REQUEST Heart

More information

PROCUREMENT DEPARTMENT 2 MONTGOMERY STREET, 3 RD FL. JERSEY CITY, NJ 07302

PROCUREMENT DEPARTMENT 2 MONTGOMERY STREET, 3 RD FL. JERSEY CITY, NJ 07302 PROCUREMENT DEPARTMENT 2 MONTGOMERY STREET, 3 RD FL. JERSEY CITY, NJ 07302 ADDENDUM # 3 Date: December 12, 2012 TO PROSPECTIVE RESPONDENTS TO RFQ# 31224: LAGUARDIA AIRPORT CENTRAL TERMINAL BUILDING REPLACEMENT

More information

Assessment of Flight and Duty Time Schemes Procedure

Assessment of Flight and Duty Time Schemes Procedure Assessment of Flight and Duty Time Schemes Procedure Purpose Fatigue is a major human factors hazard because it affects a crew member s ability to perform their tasks safely. Operator fatigue management

More information

DRAFT COMMISSION REGULATION (EU) / of XXX. laying down rules and procedures for the operation of unmanned aircraft

DRAFT COMMISSION REGULATION (EU) / of XXX. laying down rules and procedures for the operation of unmanned aircraft DRAFT COMMISSION REGULATION (EU) / of XXX laying down rules and procedures for the operation of unmanned aircraft THE EUROPEAN COMMISSION, Having regard to the Treaty on the Functioning of the European

More information

Summary of stakeholder consultation on the possible revision of Regulation 261/2004

Summary of stakeholder consultation on the possible revision of Regulation 261/2004 Summary of stakeholder consultation on the possible revision of Regulation 261/2004 30 May 2012 Steer Davies Gleave 28-32 Upper Ground London, SE1 9PD +44 (0)20 7910 5000 www.steerdaviesgleave.com 1 Overview

More information

TERMS & CONDITIONS. AFL EVENT OFFICE PERTH AFL Authorised ON-SELLER OSAFL17/21

TERMS & CONDITIONS. AFL EVENT OFFICE PERTH AFL Authorised ON-SELLER OSAFL17/21 TERMS & CONDITIONS AFL EVENT OFFICE PERTH AFL Authorised ON-SELLER OSAFL17/21 BOOKING All prices quoted by are inclusive of Goods & Services Tax (GST) where applicable - unless otherwise stated. Please

More information

luxaviation S.A. GENERAL TERMS AND CONDITIONS OF BUSINESS

luxaviation S.A. GENERAL TERMS AND CONDITIONS OF BUSINESS luxaviation S.A. GENERAL TERMS AND CONDITIONS OF BUSINESS 1. DEFINITIONS 1.1 Carrier is luxaviation S.A. 1.2 Charter is the contract between the Carrier and the Charterer. 1.3 Charterer is any person,

More information